{"id":1117,"date":"2015-01-27T09:54:10","date_gmt":"2015-01-26T22:54:10","guid":{"rendered":"http:\/\/www.bnmme.com.au\/?p=1117"},"modified":"2015-01-27T09:54:10","modified_gmt":"2015-01-26T22:54:10","slug":"iron-ore-production-in-the-northern-territory-grinds-to-a-sad-and-costly-halt","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2015\/01\/27\/iron-ore-production-in-the-northern-territory-grinds-to-a-sad-and-costly-halt\/","title":{"rendered":"Iron ore production in the Northern Territory grinds to a sad and costly halt"},"content":{"rendered":"<p><a href=\"http:\/\/www.bnmme.com.au\/wp-content\/uploads\/2015\/11\/6046596-3x2-700x467.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.bnmme.com.au\/wp-content\/uploads\/2015\/11\/6046596-3x2-700x467.jpg\" alt=\"6046596-3x2-700x467\" width=\"700\" height=\"467\" class=\"alignleft size-full wp-image-1118\" data-wp-pid=\"1118\" \/><\/a>The Northern Territory&#8217;s last operating iron ore mine has ground to a halt, wrapping up what has been a disastrous six months for the sector in the Top End.<\/p>\n<p>After months of speculation, the Frances Creek mine near Pine Creek has now stopped production, joining Sherwin Iron and Western Desert Resources which went into voluntary administration last year.<\/p>\n<p>Terry O&#8217;Connor, from the Darwin Port Corporation, said the collapse of the Territory&#8217;s iron ore sector was a big blow for the port.<\/p>\n<p>&#8220;The iron ore trade was our biggest customer in terms of return to the port and its [collapse, has left] a significant hole in our budget,&#8221; he said.<\/p>\n<p>&#8220;Our understanding, at this stage, is that the plan is to finish up the operation at Frances Creek, [but] they still believe there&#8217;s a chance they may recommence [mining] at some stage in 12 months or so.<\/p>\n<p>&#8220;[However] our feeling is, it&#8217;ll take a significant amount of time to remobilise and get everything to happen, so we certainly don&#8217;t expect to see any new exports of iron ore out of Frances Creek before this time next year or even 18 months at the earliest.<\/p>\n<p>&#8220;We&#8217;d like to think they&#8217;ll come back. But it&#8217;s demand driven, we understand that. There&#8217;s always peaks and troughs and this is a trough at the moment.&#8221;<\/p>\n<p>AUDIO: Terry O&#8217;Connor says the collapse of NT iron ore projects will leave a hole in the Darwin Port&#8217;s budget (ABC Rural)<br \/>\nMr O&#8217;Connor said the last loads of iron ore from Frances Creek were delivered to the port in late December.<\/p>\n<p>He said there were about 250,000 tonnes stockpiled at the port, to be exported over the coming months.<\/p>\n<p>From a workforce of over 300, it is understood there are now just 20 workers left at the Frances Creek project and that number will be reduced again in the coming weeks.<\/p>\n<p>The plunging iron ore price, which sparked problems for all three Top End iron mines, has dipped below $US65 a tonne, its lowest point since 2009.<\/p>\n<p>Mining town of Pine Creek suffering<\/p>\n<p>Ray Wooldridge has lived in the mining town of Pine Creek since 1991 and has seen plenty of ups and downs.<\/p>\n<p>He said the mothballing of Territory Iron&#8217;s Frances Creek project has hit the town hard.<\/p>\n<p>&#8220;If you take a workforce of 300 people out of a town of about 600, it has a dramatic effect,&#8221; he said.<\/p>\n<p>&#8220;Most of the people [who worked at the mine] have gone, there&#8217;s been fire sales and those who had housing or were renting have sold up and moved on.<\/p>\n<p>&#8220;There&#8217;s quite a few empty houses in town now.&#8221;<\/p>\n<p>The opening hours of many businesses in Pine Creek have been reduced and one of the licensed premises has decided to close for the wet season because there are so few people in town.<\/p>\n<p>ABC Rural visited one bar at 6 o&#8217;clock on a Saturday, which was serving eight patrons.<\/p>\n<p>&#8220;It&#8217;s getting very, very quiet&#8221; said the barmaid.<\/p>\n<p>AUDIO: Ray Wooldridge from Pine Creek says the town is doing it tough (ABC Rural)<br \/>\nThe planned shutdown of the Frances Creek iron ore mine was first reported by ABC Rural in July 2014.<\/p>\n<p>The mining company, Territory Iron, has still not offered up anyone for a comment.<br \/>\n<a href=\"http:\/\/www.bnmme.com.au\/wp-content\/uploads\/2015\/11\/5516208-3x2-700x467.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.bnmme.com.au\/wp-content\/uploads\/2015\/11\/5516208-3x2-700x467.jpg\" alt=\"5516208-3x2-700x467\" width=\"700\" height=\"467\" class=\"alignleft size-full wp-image-1119\" data-wp-pid=\"1119\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Northern Territory&#8217;s last operating iron ore mine has ground to a halt, wrapping up what has been a disastrous six months for the sector in the Top End. After months of speculation, the Frances Creek mine near Pine Creek has now stopped production, joining Sherwin Iron and Western Desert Resources which went into voluntary &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2015\/01\/27\/iron-ore-production-in-the-northern-territory-grinds-to-a-sad-and-costly-halt\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Iron ore production in the Northern Territory grinds to a sad and costly halt&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[6],"tags":[],"class_list":["post-1117","post","type-post","status-publish","format-standard","hentry","category-mines-and-quarry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-i1","jetpack-related-posts":[{"id":804,"url":"https:\/\/yinghuiinternational.com\/index.php\/2015\/02\/02\/nullagine-joint-venture\/","url_meta":{"origin":1117,"position":0},"title":"Nullagine Joint Venture","author":"yinghui","date":"February 2, 2015","format":false,"excerpt":"The Nullagine Joint Venture (NJV) is an unincorporated 75:25 joint venture between BC Iron and Fortescue Metals Group (Fortescue), which is located approximately 150km north of Newman in the Pilbara region of Western Australia. The NJV is a producing iron ore mine with the capacity to export up to 6Mtpa\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"Nullagine-Joint-Venture-location","src":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/02\/Nullagine-Joint-Venture-location.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/02\/Nullagine-Joint-Venture-location.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/02\/Nullagine-Joint-Venture-location.jpg?resize=525%2C300 1.5x"},"classes":[]},{"id":511,"url":"https:\/\/yinghuiinternational.com\/index.php\/2014\/10\/28\/mount-gibson-iron\/","url_meta":{"origin":1117,"position":1},"title":"Mount Gibson Iron","author":"yinghui","date":"October 28, 2014","format":false,"excerpt":"Mount Gibson is a leading independent player in the Australian iron ore industry. Established in Perth in 1996 and listed on the Australian Stock Exchange (ASX) in 2002, the Company owns and operates: Tallering Peak \u2013 a 3-million tonnes per annum iron ore mine in the Midwest region of Western\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8758,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/07\/25\/8758\/","url_meta":{"origin":1117,"position":2},"title":"Fenix completes $25 million iron ore acquisition","author":"yinghui","date":"July 25, 2023","format":false,"excerpt":"OLIVIA THOMSON Fenix Resources has\u00a0completed\u00a0the acquisition of Mount Gibson Iron\u2019s Mid-West iron ore, port and rail assets. In June 2023, Mount Gibson\u00a0reached\u00a0a conditional agreement to divest its Mid-West hematite iron ore mining and infrastructure assets to Fenix for $25 million. The deal comprised of $10 million in cash and 60\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8592,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/05\/22\/maca-secures-iron-clad-contract\/","url_meta":{"origin":1117,"position":3},"title":"MACA secures iron-clad contract","author":"yinghui","date":"May 22, 2024","format":false,"excerpt":"KELSIE TIBBEN Altas Iron\u2019s Sanjiv Ridge iron ore site, nearby Miralga Creek. Supplied: Atlas Iron. MACA has locked in a major contract at Atlas Iron\u2019s Miralga Creek iron ore project in the Pilbara region of Western Australia. The mining, civil and mineral processing contractor will provide mining and drill and\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"MACA","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/11\/ATLASIRON-SANJIVRIDGE2022-COMMOTIONMEDIA-DJI_0187-reduced-1024x682.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/11\/ATLASIRON-SANJIVRIDGE2022-COMMOTIONMEDIA-DJI_0187-reduced-1024x682.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/11\/ATLASIRON-SANJIVRIDGE2022-COMMOTIONMEDIA-DJI_0187-reduced-1024x682.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/11\/ATLASIRON-SANJIVRIDGE2022-COMMOTIONMEDIA-DJI_0187-reduced-1024x682.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8614,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/06\/13\/waters-run-iron-at-port-of-esperance\/","url_meta":{"origin":1117,"position":4},"title":"Waters run iron at Port of Esperance","author":"yinghui","date":"June 13, 2024","format":false,"excerpt":"ALEXANDRA EASTWOOD Image: dudlajzov\/stock.adobe.com The Port of Esperance in Western Australia will welcome a new iron ore exporter in a deal to boost iron ore trade by up to 1.5 million tonnes a year. The new agreement will see Gold Valley Iron Ore be granted access to critical iron ore\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/06\/Esperance-1024x613.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/06\/Esperance-1024x613.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/06\/Esperance-1024x613.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/06\/Esperance-1024x613.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8762,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/07\/04\/iron-ore-miner-reboots-shine-operations\/","url_meta":{"origin":1117,"position":5},"title":"Iron ore miner reboots Shine operations","author":"yinghui","date":"July 4, 2024","format":false,"excerpt":"KELSIE TIBBEN Shine is located near Fenix's Iron Ridge operation in Western Australia. Image: Fenix Resources Fenix Resources is taking steps to recommence mining at the Shine iron ore mine in Western Australia. The miner took the reins of Shine as part of its\u00a0acquisition\u00a0of Mount Gibson Iron\u2019s Mid-West iron ore,\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/1117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=1117"}],"version-history":[{"count":0,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/1117\/revisions"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=1117"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=1117"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=1117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}