{"id":2374,"date":"2017-05-30T09:34:24","date_gmt":"2017-05-29T23:34:24","guid":{"rendered":"http:\/\/yinghuiinternational.com\/?p=2374"},"modified":"2017-05-30T09:34:24","modified_gmt":"2017-05-29T23:34:24","slug":"turning-mining-performance-around-moving-from-efficiency-to-effectiveness","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2017\/05\/30\/turning-mining-performance-around-moving-from-efficiency-to-effectiveness\/","title":{"rendered":"Turning mining performance around: Moving from efficiency to effectiveness"},"content":{"rendered":"<p class=\"p1\">During the last upswing in the commodity cycle, the incoming tide lifted all ships. But, to paraphrase Warren Buffet, now that the tide has gone out it seems to many investors that the mining industry has been swimming naked.<\/p>\n<p class=\"p3\"><span class=\"s1\">PricewaterhouseCoopers\u2019 (PwC) <i>Mine 2016<\/i> contains some sobering facts.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">The PwC financial index for the top 40 miners (2015) shows earnings before interest, tax, depreciation and amortisation (EBITDA) at levels lower than during the global financial crisis (GFC).<\/span><\/p>\n<p class=\"p3\">During the upswing, miners took on substantial debt to increase production volume, but now the cash flow is not sufficient to retire this debt.<\/p>\n<p class=\"p3\"><span class=\"s1\">The financial industry has started to lose faith in mining companies\u2019 ability to generate a decent return. This affects the availability and terms for obtaining equity and share capital.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">And finally, it states: \u201cPressure will rise as attention turns to the next wave of productivity initiatives, which will have longer-term paybacks and require fundamental rethinking of structures, processes, systems, technology, organisational designs and capability needs. This is uncharted territory for the industry, at a time of rapid change in all sectors of the global economy.\u201d<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">It is the authors\u2019 opinion that this fundamental rethink has happened and is being applied successfully, even though the majority of the mining establishment is unaware of this.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Over the past 15 years we have observed a productivity intervention, delivering 20 per cent average output increase, in over 80 mine interventions, spanning Africa, South America and Asia.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">This required limited or no capex, using no more than two consultants and within three to five months. The approach engages employees, and drastically reduces the cognitive load and pressure on mine management.<\/span><\/p>\n<p class=\"p4\"><strong>The impact of increased productivity on mine profitability<\/strong><\/p>\n<p class=\"p2\"><span class=\"s1\">It is clear a turnaround requires drastic, sustainable productivity improvement. In a 2015 article titled: <i>Productivity in mining operations: Reversing the downward trend<\/i>, McKinsey showed that mining productivity had declined an average 28 per cent over the past decade.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">From this, there would seem to be ample opportunity for improvement. Ernst and Young\u2019s 2014 report: <i>Productivity in mining: Now comes the hard part<\/i> noted: \u201cExecutives see increasing productivity as their number one challenge, most are reducing cost and increasing volumes, but this has not affected the core productivity of miners.\u201d<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">It is possible to make a conservative estimate of the impact of the productivity gap on the financial performance of miners by using the aggregate top 40 financials from the <i>PwC Mine<\/i> 2016 report.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">According to this data, in 2015, if the top 40 could increase output by 20 per cent (using current assets), they would have delivered a 345 per cent increase in EBITDA.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">This calculation assumes that sales value increase by 20 per cent, totally variable cost of production comprises no more than 50 per cent of the operational cost. Increasing supply would decrease pricing, but this would not be the case if a small fraction of mines improved to this extent.<\/span><\/p>\n<p class=\"p4\"><strong>Why is the mining productivity decline persisting?<\/strong><\/p>\n<p class=\"p2\"><span class=\"s1\">A production system can be conceived as existing of three critical, interacting elements: technology, process and people.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Most productivity improvement efforts have focused on these elements in isolation, and in particular on better technology (automation, big data) or improving on process models. Strengthening and adjusting the linkages from these elements to the people link, and the people element itself have not received much attention.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Doing better than what we have always done will not deliver these results. Einstein said: \u201cWe cannot solve our problems at the level of\u00a0<\/span><span class=\"s1\">thinking that caused them in the first place.\u201d<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">The new paradigm requires a shift in the way the production flow process is designed and managed and strengthening of the link between production process flow and people behaviour. This drastically simplifies what needs to be done and allows managers and employees to coordinate horizontally, close to where the work is happening.<\/span><\/p>\n<p class=\"p2\"><strong>Eliminating variability and optimising all processes<\/strong><\/p>\n<p class=\"p3\"><span class=\"s1\">Despite increasing knowledge around systems thinking and complexity, best practice in managing production flow in mining does not take these ideas into account.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Mining is different from most manufacturing systems in that the variability experienced is much greater and in that, the interdependence between production steps are tight, not only in space but also in time. Applying what works in manufacturing into mining should therefore be done carefully. Operational excellence, statistical process control, lean and the theory of constraints are all necessary, but not sufficient.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">People aspects need to be integrated with all of these interventions. More important is that the prevailing management paradigm needs adjustment to do this integration well.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Systems thinker Russel Ackoff maintained: \u201cIf we optimise all the parts of the system then the overall system will not be optimised. And if we optimise the overall system then all the parts will not be optimised.\u201d<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">And yet, with the help of ERP systems and budgets, the production flow through mines is constrained by trying to improve the local efficiency of every production department. The belief is that better planning and reducing variability will deliver better results \u2013 in this way we force certainty on what is inherently uncertain. This results in inter-departmental and hierarchical conflict, leading to unstable flow.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">The consequence of this thinking is that we try to plan production with \u201cjust enough of everything\u201d. In this way, we hope that we will achieve high efficiency on all the parts and thus achieve the greatest productivity for the system.\u00a0<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">This is a fundamental mistake.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">If we were to put together a set of six production units in sequence, each capable of delivering on average 10 units per hour, most observers would expect an average of 10 units produced every hour.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">That would have to deliver 100 per cent efficiency in each process. But industrial processes do not follow a normal distribution.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Often a unit goes down and output is zero for that period. This unit blocks all the processes before and starves all downstream. For the time the unit is down no production occurs.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">The unit sometimes produces 12, but then 0 now and then delivers 10 on average. The instantaneous output of the chain is always determined by the slowest production department \u2013 this gives us an overall chain which only produces five.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">This important fact, which management is not aware of, creates tremendous pressure for mine personnel to improve. Often employee engagement is negatively affected.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">In most chains one will find one production department with less capacity. This department should determine the maximum output achievable, and cause work to pile up here, but due to the dynamics described the bottleneck often seems to move.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">This means that the flow is so unstable that output is significantly less than what the bottleneck department can deliver. This is where the lost output can be liberated.<\/span><\/p>\n<p class=\"p1\"><strong>A step change in mining productivity<\/strong><\/p>\n<p class=\"p2\"><span class=\"s1\">Embrace variability and learn to manage it.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">We have to identify the capacity bottleneck, put a material buffer in front and a space buffer behind and then ensure excess capacity in the other departments.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">In this way, we can decouple the bottleneck from the rest of the system and replenish the buffers in time. Instead of focusing our attention on six departments we ensure that the bottleneck is resourced for maximum production and efficiency.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Other departments will work on not depending on the status of the two buffers. This simplifies production dramatically. The part in blue (see figure 1) is now added to the output, typically around 20 per cent of the\u00a0 total.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">It is important to note that non-bottleneck departments in this example need to be resourced and run at 12 and 13 units capacity. This is to ensure that the buffers can be quickly replenished in cases where they have almost been depleted.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">These departments will show a drop in their efficiency measurements, to the consternation of those tasked with measuring performance. It is crucial that change be allowed, only the bottleneck department needs to run at maximum efficiency, this requires a huge shift in thinking.<\/span><\/p>\n<p class=\"p2\"><strong><span class=\"s1\">Reconfigure and strengthen the process \u2013 people link<\/span><\/strong><\/p>\n<p class=\"p3\"><span class=\"s1\">A daily 30-minute cross-functional meeting is instituted. This is where the heads of departments, middle managers and selected employees get up-to-date visual information on what is happening to the production process (flow).<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Colour codes identify where attention should be focused and where help from support functions such as HR and maintenance is\u00a0required.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">The productivity platform meeting provides visual feedback on the processes workers are responsible for and shows them how their actions affect the overall system and the outcomes.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">It highlights problem areas in these processes and allows for dialogue in improving understanding of causes and actions to take. Management and workers simultaneously become aware of problems in the system, and restrictive policies and bottlenecks are addressed on the spot.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">It is not possible to hide anymore \u2013 those not doing their part are visible to all. Peer pressure ensures that they rise to the challenge and start to support their colleagues.\u00a0<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Sometimes, as workers start to experience success, they become accountable and begin to volunteer their energy and talents. This reduces the load on management; they are not drawn into work which can be better performed by their employees.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">A system of this nature was first implemented at Peabody Energy\u2019s Warkworth mine in 1995 and yielded a productivity gain of 16 per cent in six months. In the past 15 years, further fine tuning has led to the development of a productivity platform which delivers a 10-50 per cent increase in output within three to five months.<\/span><\/p>\n<p class=\"p1\"><strong>Sustainability<\/strong><\/p>\n<p class=\"p2\"><span class=\"s1\">The intervention is sustainable, provided the management team stays intact. After a few years of excellent performance, it is typical for the person that initiated the project to be promoted.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">The new manager often lacks the context of the new paradigm and re-introduces standard industry practice. Output reverts to the level before the intervention. This points to the need for expanding the intervention to include top management. Otherwise, the intervention survives as an island of new thinking in a sea of old paradigms, eventually it will be submerged.<\/span><\/p>\n<p class=\"p1\"><strong>Summary<\/strong><\/p>\n<p class=\"p2\"><span class=\"s1\">Miners are aware of the need for dramatic productivity improvement. When asked whether they are doing productivity improvement the answer is nearly always \u201cwe are doing this already\u201d. The absence of substantial sustainable results suggests that something is amiss in these efforts.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">The new approach flows from complexity science and systems thinking and pushes for greater effectiveness instead of greater localised efficiency. It does not attempt to force certainty (through better central planning) onto processes and interactions that are inherently uncertain.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">It states that variability in mining is a given and needs to be managed, it cannot be eliminated. Centralised decision making must be relaxed and replaced with horizontally coordinated decisions close to the coalface.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">We do this so that management maintains visibility of what is happening. In this way, we can empower and engage our employees without losing command of the situation.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">This requires mine managers to embrace a new paradigm, which requires courage. But the reward to risk ratio is tremendous, a 20 per cent increase in output fundamentally affects mine profitability and the mine\u2019s position on the cost curve.\u00a0<\/span><\/p>\n<p class=\"p2\"><span class=\"s1\"><i>This article was written by Stratflow Australia\u2019s Hendrik Lourens. It was co-authored by Blakemore Consulting\u2019s John Blakemore.<\/i><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>During the last upswing in the commodity cycle, the incoming tide lifted all ships. But, to paraphrase Warren Buffet, now that the tide has gone out it seems to many investors that the mining industry has been swimming naked. PricewaterhouseCoopers\u2019 (PwC) Mine 2016 contains some sobering facts. The PwC financial index for the top 40 &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2017\/05\/30\/turning-mining-performance-around-moving-from-efficiency-to-effectiveness\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Turning mining performance around: Moving from efficiency to effectiveness&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[6,36],"tags":[],"class_list":["post-2374","post","type-post","status-publish","format-standard","hentry","category-mines-and-quarry","category-new-ideas"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-Ci","jetpack-related-posts":[{"id":7978,"url":"https:\/\/yinghuiinternational.com\/index.php\/2021\/06\/09\/bhp-and-rio-top-pwc-global-miner-report\/","url_meta":{"origin":2374,"position":0},"title":"BHP and Rio top PwC global miner report","author":"yinghui","date":"June 9, 2021","format":false,"excerpt":"Five Australian mining companies have been named among the world\u2019s Top 40 miners in Pricewaterhouse Coopers\u2019 (PwC) annual Mine 2021 report, with early forecasts suggesting the industry will record the second highest net profits in 18 years. According to PwC\u2019s 18th\u00a0annual report, BHP and Rio Tinto retained their positions as\u2026","rel":"","context":"In &quot;Go Australia (\u8d70\u8fdb\u6fb3\u6d32)&quot;","block_context":{"text":"Go Australia (\u8d70\u8fdb\u6fb3\u6d32)","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/go-australia\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1136,"url":"https:\/\/yinghuiinternational.com\/index.php\/2015\/12\/02\/the-top-ten-issues-facing-miners-in-2016\/","url_meta":{"origin":2374,"position":1},"title":"The top ten issues facing miners in 2016","author":"yinghui","date":"December 2, 2015","format":false,"excerpt":"Deloitte has compiled a new report outlining the top 10 problems miners will face next year. Ongoing commodity weakness with little sign of respite, and a negative investment environment ahead, has created a continued poor market for mining yet tax burdens and stakeholder expectations remains just as high as during\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"kct_aerial_reclaiming-and-stockyard","src":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/12\/kct_aerial_reclaiming-and-stockyard.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1077,"url":"https:\/\/yinghuiinternational.com\/index.php\/2015\/11\/03\/experienced-players-prepare-for-mining-upswing\/","url_meta":{"origin":2374,"position":2},"title":"Experienced players prepare for mining upswing","author":"yinghui","date":"November 3, 2015","format":false,"excerpt":"Research from Business News found that five significant 'greenfields' mining projected, worth $760 million, have started development in the past year. Looking ahead to 2017, there might be only one major new mining project although there have been no guarantees. In Deloitte Access Economics' latest investment monitor, the value of\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"sEVLeuR","src":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/11\/sEVLeuR.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1706,"url":"https:\/\/yinghuiinternational.com\/index.php\/2016\/07\/28\/embrace-innovation-or-suffer-deloitte-tells-miners\/","url_meta":{"origin":2374,"position":3},"title":"Embrace innovation or suffer, Deloitte tells miners","author":"yinghui","date":"July 28, 2016","format":false,"excerpt":"Cost cutting and incremental improvements aren\u2019t enough to lift mining, and the industry must embrace innovation or else, a Deloitte report says. In its recent Innovation in Mining report, Deloitte explained that the industry understood the innovation concept but it is failing to implement it effectively, and the current focus\u2026","rel":"","context":"In &quot;New Ideas&quot;","block_context":{"text":"New Ideas","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/new-ideas\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1626,"url":"https:\/\/yinghuiinternational.com\/index.php\/2016\/07\/07\/miners-need-to-focus-on-balance-sheets-to-survive-ey-says\/","url_meta":{"origin":2374,"position":4},"title":"Miners need to focus on balance sheets to survive, EY says","author":"yinghui","date":"July 7, 2016","format":false,"excerpt":"Mining companies need to focus on strengthening their balance sheets and generating cash if they are to survive current market instability, EY states in its latest report. In its latest report, Navigating Volatility: Do you change your business or the way your business works, EY predicts the current period of\u2026","rel":"","context":"In &quot;Big Data&quot;","block_context":{"text":"Big Data","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/big-data\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1210,"url":"https:\/\/yinghuiinternational.com\/index.php\/2016\/01\/13\/2016-the-year-ahead-for-mining-and-mets\/","url_meta":{"origin":2374,"position":5},"title":"2016: The year ahead for mining and METS","author":"yinghui","date":"January 13, 2016","format":false,"excerpt":"The start to 2016 for the mining and METS sectors has been a disappointing one. Whilst iron ore has temporarily risen in price, it is forecast to drop back down to around $US30 per tonne, and another smaller iron ore player, Gindalbie Metals, has been abandoned by parent company Ansteel\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/2374","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=2374"}],"version-history":[{"count":1,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/2374\/revisions"}],"predecessor-version":[{"id":2375,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/2374\/revisions\/2375"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=2374"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=2374"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=2374"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}