{"id":2668,"date":"2018-03-19T09:27:49","date_gmt":"2018-03-18T22:27:49","guid":{"rendered":"http:\/\/yinghuiinternational.com\/?p=2668"},"modified":"2018-03-21T09:30:21","modified_gmt":"2018-03-20T22:30:21","slug":"dalgaranga-two-months-from-gold-production","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2018\/03\/19\/dalgaranga-two-months-from-gold-production\/","title":{"rendered":"Dalgaranga two months from gold production"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2669\" src=\"http:\/\/yinghuiinternational.com\/wp-content\/uploads\/2018\/03\/dalgaranga-1-604x270.png\" alt=\"\" width=\"604\" height=\"270\" srcset=\"https:\/\/yinghuiinternational.com\/wp-content\/uploads\/2018\/03\/dalgaranga-1-604x270.png 604w, https:\/\/yinghuiinternational.com\/wp-content\/uploads\/2018\/03\/dalgaranga-1-604x270-400x179.png 400w, https:\/\/yinghuiinternational.com\/wp-content\/uploads\/2018\/03\/dalgaranga-1-604x270-300x134.png 300w, https:\/\/yinghuiinternational.com\/wp-content\/uploads\/2018\/03\/dalgaranga-1-604x270-600x268.png 600w, https:\/\/yinghuiinternational.com\/wp-content\/uploads\/2018\/03\/dalgaranga-1-604x270-280x125.png 280w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/p>\n<p>Gascoyne Resources is two months away from producing first gold at the Dalgaranga gold project in Western Australia.<\/p>\n<p>The company today reported that process plant construction is 90 per cent complete and it is on schedule for wet ore commissioning and first gold in May.<\/p>\n<p>Installation of the <span style=\"color: #ff6600;\">SAG mill, crusher and mechanical equipment<\/span> are \u201cwell advanced\u201d, according to Gascoyne, while electrical installation is under way and water services have been commissioned and handed over to the operations team.<\/p>\n<p>\u201c<span style=\"color: #ff6600;\">GR Engineering<\/span> has progressed significantly with the design, engineering and construction of the 2.5 million tonne per annum Dalgaranga processing plant,\u201d The company said in an ASX announcement.<\/p>\n<p>\u201cDesign and engineering is complete and construction over 90 per cent complete with completion expected in around two months, approximately one month ahead of schedule.\u201d<\/p>\n<p>Dalgaranga\u2019s mining contractor, NRW Holdings, has launched mining at the Sly Fox, Golden Wings and Gilbey deposits, with a fleet of four excavators and 18 trucks mobilised to site.<\/p>\n<p>Construction of the mining workshops and associated facilities is continuing and expected to be operational by the end of this month.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gascoyne Resources is two months away from producing first gold at the Dalgaranga gold project in Western Australia. The company today reported that process plant construction is 90 per cent complete and it is on schedule for wet ore commissioning and first gold in May. Installation of the SAG mill, crusher and mechanical equipment are &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2018\/03\/19\/dalgaranga-two-months-from-gold-production\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Dalgaranga two months from gold production&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[6,7],"tags":[],"class_list":["post-2668","post","type-post","status-publish","format-standard","hentry","category-mines-and-quarry","category-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-H2","jetpack-related-posts":[{"id":2594,"url":"https:\/\/yinghuiinternational.com\/index.php\/2018\/02\/01\/demand-for-mining-services-ramps-up\/","url_meta":{"origin":2668,"position":0},"title":"Demand for mining services ramps up","author":"yinghui","date":"February 1, 2018","format":false,"excerpt":"It was undoubtedly a better year for Australia\u2019s leading mining services companies in 2017. Improved commodity prices led to an increase in mining activity, meaning the expertise of the country\u2019s mining services contractors was in growing demand. Australian Mining\u00a0takes a closer look at some of the companies that were awarded\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1001,"url":"https:\/\/yinghuiinternational.com\/index.php\/2015\/10\/10\/how-striker-is-serving-the-resources-industry-worldwide-with-heavy-equipment-and-turnkey-design\/","url_meta":{"origin":2668,"position":1},"title":"How Striker is serving the resources industry worldwide with heavy equipment and turnkey design","author":"yinghui","date":"October 10, 2015","format":false,"excerpt":"An Australian success story of design innovation, engineering expertise and product excellence, Striker is a reputed heavy equipment manufacturing company that has made its presence felt in the global market with a complete range of fixed, portable, mobile and track plants. Striker\u2019s modest beginnings in Perth, Western Australia in 1998\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"Striker-JM1310-two-CM400-track-cones-and-Striker-SCH208-screening-plant","src":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/10\/Striker-JM1310-two-CM400-track-cones-and-Striker-SCH208-screening-plant.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":8383,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/08\/19\/evolution-updates-ernest-henry-mineral-resource\/","url_meta":{"origin":2668,"position":2},"title":"Evolution updates Ernest Henry mineral resource","author":"yinghui","date":"August 19, 2023","format":false,"excerpt":"OLIVIA THOMSON Evolution Mining has released an updated mineral resource estimate for its Ernest Henry project. Ernest Henry\u00a0is located 38km north-east of Cloncurry, Queensland\u00a0and is a large-scale copper-gold operation. Its mine life was\u00a0extended\u00a0in June of this year. As of June 30, the Ernest Henry mineral resource is estimated at 101.5\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2019\/04\/Evolution-1024x447.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2019\/04\/Evolution-1024x447.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2019\/04\/Evolution-1024x447.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2019\/04\/Evolution-1024x447.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8829,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/08\/15\/metso-locks-in-333m-order-at-reko-diq\/","url_meta":{"origin":2668,"position":3},"title":"Metso locks in $333m order at Reko Diq","author":"yinghui","date":"August 15, 2024","format":false,"excerpt":"Olivia Thomson Image: Metso Metso has signed a comprehensive frame agreement with Reko Diq Mining, the owner of the Reko Diq copper-gold project, one of the largest undeveloped copper-gold deposits in the world. Under the agreement, Metso will deliver crushing and grinding circuits that include Superior\u00a06089 MKIII gyratory crushers, Nordberg\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8908,"url":"https:\/\/yinghuiinternational.com\/index.php\/2025\/02\/11\/a-gold-standard-crushing-and-screening-performance-at-agnew\/","url_meta":{"origin":2668,"position":4},"title":"A gold-standard crushing and screening performance at Agnew","author":"yinghui","date":"February 11, 2025","format":false,"excerpt":"Staff Writer A New crushing and screening plant at Agnew Gold is delivering financial rewards to Gold Fields. Image: Sandvik A new Sandvik crushing and screening plant at Gold Fields\u2019 Agnew gold mine in WA is delivering greater efficiency, throughput and operational safety. Gold Fields Limited is one of the\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/sandvik-e1739318757709-1024x678.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/sandvik-e1739318757709-1024x678.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/sandvik-e1739318757709-1024x678.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/sandvik-e1739318757709-1024x678.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":1010,"url":"https:\/\/yinghuiinternational.com\/index.php\/2015\/10\/07\/thyssenkrupp-merges-polysius-and-kh-mineral-assets-in-france\/","url_meta":{"origin":2668,"position":5},"title":"ThyssenKrupp merges Polysius and KH Mineral assets in France","author":"yinghui","date":"October 7, 2015","format":false,"excerpt":"The industrial and technology group ThyssenKrupp is strengthening its plant technology capabilities in France by merging the formerly separate entities Polysius and KH Mineral to become ThyssenKrupp Industrial Solutions (France). The step comes into effect as of October 1, 2015. The company said that this strategic move \u201cis another milestone\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/news\/"},"img":{"alt_text":"246-720x375","src":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/10\/246-720x375.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/10\/246-720x375.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/10\/246-720x375.jpg?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/10\/246-720x375.jpg?resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/2668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=2668"}],"version-history":[{"count":2,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/2668\/revisions"}],"predecessor-version":[{"id":2671,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/2668\/revisions\/2671"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=2668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=2668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=2668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}