{"id":2999,"date":"2018-05-10T13:13:56","date_gmt":"2018-05-10T03:13:56","guid":{"rendered":"http:\/\/yinghuiinternational.com\/?p=2999"},"modified":"2018-05-16T13:15:00","modified_gmt":"2018-05-16T03:15:00","slug":"biggest-wind-farm-in-the-southern-hemisphere-proposed-for-victoria","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2018\/05\/10\/biggest-wind-farm-in-the-southern-hemisphere-proposed-for-victoria\/","title":{"rendered":"Biggest wind farm in the southern hemisphere proposed for Victoria"},"content":{"rendered":"<div class=\"social-common\">\n<div class=\"top-story row\">\n<h1>The biggest wind farm in the southern hemisphere with the capacity to power an estimated half a million homes a year by 2025 will be built about 130km west of Melbourne, if the Andrews state government give the project the green light.<\/h1>\n<\/div>\n<\/div>\n<div class=\"article-content\">\n<div class=\"article-image\"><img decoding=\"async\" title=\"\" src=\"https:\/\/www.insideconstruction.com.au\/w-images\/fb70511e-dd99-4716-bfd2-e25379c75eea\/3\/fill\/GoldenPlainsWindFarm-670x300.jpg\" alt=\"image\" \/><\/div>\n<p>In development since 2006, the proposed $1.7 billion\u00a0<a href=\"http:\/\/w-wind.com.au\/golden-plains-wind-farm\/\">Golden Plains Wind Farm<\/a>\u00a0would sprawl across 167 square kilometres of farmland near the small town of Rokewood in southwest Victoria, about 40km south of Ballarat.<\/p>\n<p>The wind farm would consist of 228 turbines &#8211; each standing 230m tall at their highest point, and will have an energy generation capacity of between 800MW and 1000MW.<\/p>\n<p>According to\u00a0<a href=\"http:\/\/w-wind.com.au\/golden-plains-wind-farm\/eesplanning-process\/ees\/#1525311462534-1745388f-1823\">planning documents<\/a>, the wind farm would produce up to 3500 gigawatt-hours of energy a year &#8211; equal to the average annual energy consumption of at least 450,000 homes.<\/p>\n<p>The project&#8217;s proponents, the German-backed, Gisborne-based company West Wind Energy says it hopes to begin construction sometime next year, but the project still requires planning approval from the Andrews state government. A planning panel will consider the proposal at a hearing due to begin on July 30.<\/p>\n<p>The planning documents state that if the project gets the green light, the wind farm would begin to operate by 2021 and be in full flight by 2025. It would then be decommissioned and pulled down sometime after 2050.<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div class=\"tags\">\n<ul>\n<li>LISTED UNDER TAG :<\/li>\n<li><a href=\"https:\/\/www.insideconstruction.com.au\/tag\/wind-farm\">WIND FARM<\/a>,\u00a0<a href=\"https:\/\/www.insideconstruction.com.au\/tag\/project-proposal\">PROJECT PROPOSAL<\/a>,\u00a0<a href=\"https:\/\/www.insideconstruction.com.au\/tag\/planning-documents\">PLANNING DOCUMENTS<\/a>,\u00a0<a href=\"https:\/\/www.insideconstruction.com.au\/tag\/energy-generation\">ENERGY GENERATION<\/a>,<a href=\"https:\/\/www.insideconstruction.com.au\/tag\/renewable-energy\">RENEWABLE ENERGY<\/a><\/li>\n<\/ul>\n<\/div>\n<div class=\"tags\">\n<ul>\n<li>LISTED UNDER CATEGORIES :<\/li>\n<li><a href=\"https:\/\/www.insideconstruction.com.au\/category\/section\/projects\/\">PROJECTS<\/a>,<\/li>\n<li><a href=\"https:\/\/www.insideconstruction.com.au\/category\/region\/victoria\/\">VICTORIA<\/a>,<\/li>\n<li><a href=\"https:\/\/www.insideconstruction.com.au\/category\/region\/australia\/\">AUSTRALIA<\/a><\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The biggest wind farm in the southern hemisphere with the capacity to power an estimated half a million homes a year by 2025 will be built about 130km west of Melbourne, if the Andrews state government give the project the green light. In development since 2006, the proposed $1.7 billion\u00a0Golden Plains Wind Farm\u00a0would sprawl across &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2018\/05\/10\/biggest-wind-farm-in-the-southern-hemisphere-proposed-for-victoria\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Biggest wind farm in the southern hemisphere proposed for Victoria&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[7],"tags":[],"class_list":["post-2999","post","type-post","status-publish","format-standard","hentry","category-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-Mn","jetpack-related-posts":[{"id":2558,"url":"https:\/\/yinghuiinternational.com\/index.php\/2018\/01\/04\/the-year-renewables-became-mainstream\/","url_meta":{"origin":2999,"position":0},"title":"THE YEAR RENEWABLES BECAME MAINSTREAM","author":"yinghui","date":"January 4, 2018","format":false,"excerpt":"South Australia\u2019s lithium-ion battery grabbed the headlines in 2017, first when Elon Musk announced he\u2019d build the world\u2019s largest battery in 100 days or it would be free, then again when he accomplished it, and yet again when the battery reacted to power surges in record time in December. But\u2026","rel":"","context":"In &quot;\u65b0\u6280\u672f\u65b0\u4ea7\u54c1&quot;","block_context":{"text":"\u65b0\u6280\u672f\u65b0\u4ea7\u54c1","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/new-tech-new-product\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8391,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/08\/28\/intergenerational-report-maps-out-minings-future\/","url_meta":{"origin":2999,"position":1},"title":"Intergenerational report maps out mining\u2019s future","author":"yinghui","date":"August 28, 2023","format":false,"excerpt":"ALEXANDRA EASTWOOD The Federal Government has released the 2023 Intergenerational Report, showing that Australia\u2019s mining sector is set to benefit from the critical minerals push. The Intergenerational Report is a \u201cbig picture view\u201d of Australia\u2019s economy over the next 40 years, projecting the outlook of the economy and the Australian\u2026","rel":"","context":"In &quot;Go Australia (\u8d70\u8fdb\u6fb3\u6d32)&quot;","block_context":{"text":"Go Australia (\u8d70\u8fdb\u6fb3\u6d32)","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/go-australia\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":2974,"url":"https:\/\/yinghuiinternational.com\/index.php\/2018\/05\/04\/energy-and-mines-australia-summit-australia-becoming-the-global-centre-for-renewables-for-mines\/","url_meta":{"origin":2999,"position":2},"title":"Energy and Mines Australia Summit: Australia becoming the global centre for renewables for mines","author":"yinghui","date":"May 4, 2018","format":false,"excerpt":"As recent project announcements show, the number of Australian mining operators seriously assessing and investing in renewables is growing rapidly. Driven by favourable economics and additional benefits including carbon reductions and social license, major and mid-tier Australian mines are adopting renewables. South32 recently announced its 3MW solar farm for its\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":674,"url":"https:\/\/yinghuiinternational.com\/index.php\/2014\/12\/10\/bhp-billiton-calls-its-new-company-south32\/","url_meta":{"origin":2999,"position":3},"title":"BHP Billiton calls its new company South32","author":"yinghui","date":"December 10, 2014","format":false,"excerpt":"South32 is the name BHP Billiton has chosen to call its new company. Under demerger plans, BHP will create a new company that will take its aluminium, manganese, nickel and silver assets. The majority of South32\u2019s assets are located in the southern hemisphere in Australia and South Africa which are\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"BHP-Billiton-calls-its-new-company-South32-658306-l_300","src":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2014\/12\/BHP-Billiton-calls-its-new-company-South32-658306-l_300.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1144,"url":"https:\/\/yinghuiinternational.com\/index.php\/2015\/12\/03\/bhp-to-wind-back-jobs-at-olympic-dam\/","url_meta":{"origin":2999,"position":4},"title":"BHP to wind back jobs at Olympic Dam","author":"yinghui","date":"December 3, 2015","format":false,"excerpt":"BHP plans to cut around 30 per cent of its full time equivalent employees at Olympic Dam by FY17, BHP says. According to a BHP spokesperson, the workforce reduction would consist mostly of contractors and other FTE employees, with the cutbacks relative to FY15. This latest announcement follows the miner's\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8543,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/03\/22\/mount-isa-mines-levels-up-renewables\/","url_meta":{"origin":2999,"position":5},"title":"Mount Isa Mines levels up renewables","author":"yinghui","date":"March 22, 2024","format":false,"excerpt":"OLIVIA THOMSON APA solar farm at Mount Isa, Queensland. Image: Glencore. Glencore\u2019s Mount Isa Mines operation is set to source 20 per cent of its long-term electricity needs from APA Group\u2019s new solar farm in Mica Creek, Queensland. Under a 15-year agreement, Mount Isa Mines can use up to 50\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/03\/APA__Solar_Farm_Jul_2023_031-1024x683.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/03\/APA__Solar_Farm_Jul_2023_031-1024x683.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/03\/APA__Solar_Farm_Jul_2023_031-1024x683.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/03\/APA__Solar_Farm_Jul_2023_031-1024x683.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/2999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=2999"}],"version-history":[{"count":1,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/2999\/revisions"}],"predecessor-version":[{"id":3000,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/2999\/revisions\/3000"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=2999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=2999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=2999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}