{"id":518,"date":"2014-10-30T09:05:49","date_gmt":"2014-10-29T22:05:49","guid":{"rendered":"http:\/\/www.bnmme.com.au\/?p=518"},"modified":"2014-10-30T09:05:49","modified_gmt":"2014-10-29T22:05:49","slug":"whitehaven-coal","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2014\/10\/30\/whitehaven-coal\/","title":{"rendered":"Whitehaven Coal"},"content":{"rendered":"<p>Our operations are currently underpinned by our new Narrabri underground operation which commenced longwall production in October 2012, and our three existing open cut mines &#8211; all situated in NSW&#8217;s Gunnedah Basin.<\/p>\n<p>Construction has commenced at our Maules Creek project and and approval is being sought for our Vickery project, also located in the Gunnedah Basin. These projects are expected to provide significant and exciting career opportunities across a wide range of mining-related professions.<\/p>\n<p>Maules Creek is one of the last major undeveloped and significant multi-seam coal deposits in New South Wales and is expected to sustain a potential project life in excess of 30 years, with average saleable coal production of 11.0 Mtpa.<\/p>\n<p>The Narrabri mine is a modern, technologically-advanced underground operation with its new longwall already exceeding initial design production rates after only one year of operation. The mine will produce over 6.0 Mtpa with an expected life in excess of 25 years.<\/p>\n<p>The company also operates a Coal Handling and Preparation Plant (CHPP) and rail loader near Gunnedah.<\/p>\n<p><a href=\"http:\/\/www.bnmme.com.au\/wp-content\/uploads\/2014\/10\/WhitehavenCoal_Asset_Portfolio.png\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.bnmme.com.au\/wp-content\/uploads\/2014\/10\/WhitehavenCoal_Asset_Portfolio.png\" alt=\"WhitehavenCoal_Asset_Portfolio\" width=\"650\" height=\"972\" class=\"aligncenter size-full wp-image-519\" data-wp-pid=\"519\" \/><\/a><\/p>\n<p>Whitehaven has an 11% interest in the Newcastle Coal Infrastructure Group (NCIG) which recently completed the construction of the final stage of a new coal export terminal at the Port of Newcastle. This is in addition to its port allocation at Port Waratah Coal Services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Our operations are currently underpinned by our new Narrabri underground operation which commenced longwall production in October 2012, and our three existing open cut mines &#8211; all situated in NSW&#8217;s Gunnedah Basin. Construction has commenced at our Maules Creek project and and approval is being sought for our Vickery project, also located in the Gunnedah &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2014\/10\/30\/whitehaven-coal\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Whitehaven Coal&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[6],"tags":[],"class_list":["post-518","post","type-post","status-publish","format-standard","hentry","category-mines-and-quarry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-8m","jetpack-related-posts":[{"id":7999,"url":"https:\/\/yinghuiinternational.com\/index.php\/2021\/07\/21\/south32-longwall-change-improves-illawarra-output\/","url_meta":{"origin":518,"position":0},"title":"South32 longwall change improves Illawarra output","author":"yinghui","date":"July 21, 2021","format":false,"excerpt":"Illawarra Metallurgical Coal. Image: South32 South32 has improved metallurgical coal production at the Illawarra metallurgical coal operation in New South Wales after returning the site to a three longwall configuration. Illawarra, which is South32\u2019s sole metallurgical coal asset, improved production 9 per cent in the 2021 financial year thanks to\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2020\/06\/25093537\/South32-illawarra-metallurgical-coal-604x270.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2020\/06\/25093537\/South32-illawarra-metallurgical-coal-604x270.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2020\/06\/25093537\/South32-illawarra-metallurgical-coal-604x270.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":561,"url":"https:\/\/yinghuiinternational.com\/index.php\/2014\/11\/16\/shenhuas-watermark-coal-project-gets-nod-from-government\/","url_meta":{"origin":518,"position":1},"title":"Shenhua\u2019s Watermark Coal project gets nod from government","author":"yinghui","date":"November 16, 2014","format":false,"excerpt":"Shenhua\u2019s huge Watermark Coal project has been recommended for approval by the NSW Department of Planning and Environment. The open-cut coal project, located 25 km south-east of Gunnedah, will produce 10 million tonnes of coal per annum if approved, and employ more than 600 people.","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8480,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/10\/20\/whitehaven-coal-swoop-a-matter-of-longevity\/","url_meta":{"origin":518,"position":2},"title":"Whitehaven coal swoop a matter of longevity","author":"yinghui","date":"October 20, 2023","format":false,"excerpt":"TIM BOND As the ink dries on Whitehaven Coal\u2019s $US4.1 billion ($6.5 billion) acquisition of two of BHP\u2019s Queensland coal assets, movement on the ASX shows that stakeholders are mulling over the broader significance of the deal. Following the announcement of\u00a0the deal\u00a0on Wednesday, Whitehaven opened on the ASX with a\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"queensland, coal, whitehaven","src":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/10\/171113_QueenslandCoal_HQ-2048x1118-1-1024x559.jpeg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/10\/171113_QueenslandCoal_HQ-2048x1118-1-1024x559.jpeg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/10\/171113_QueenslandCoal_HQ-2048x1118-1-1024x559.jpeg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/10\/171113_QueenslandCoal_HQ-2048x1118-1-1024x559.jpeg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":1676,"url":"https:\/\/yinghuiinternational.com\/index.php\/2016\/07\/21\/bhp-records-production-declines-as-it-continues-streamlining\/","url_meta":{"origin":518,"position":3},"title":"BHP records production declines as it continues \u2018streamlining\u2019","author":"yinghui","date":"July 21, 2016","format":false,"excerpt":"BHP has recorded a drop in first half production levels across the board. The global miner saw year on year falls in production for petroleum, copper, iron ore, and thermal coal, although it has recorded a slight uptick in coking coal. On the back of its latest results, BHP CEO\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"bhp_3.jpg","src":"https:\/\/i0.wp.com\/d9lhxyivbnow1.cloudfront.net\/wp-content\/uploads\/2016\/04\/06052752\/bhp_3.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":7960,"url":"https:\/\/yinghuiinternational.com\/index.php\/2021\/04\/27\/records-rain-on-south32-in-2021\/","url_meta":{"origin":518,"position":4},"title":"Records rain on South32 in 2021","author":"yinghui","date":"April 27, 2021","format":false,"excerpt":"By Henry Ballard Illawarra Metallurgical Coal. Image: South32 South32 has met or exceeded production expectations across its Australian operations, not allowing inclement weather to diminish a strong March quarter. Worsley Alumina, in which South32 owns 86 per cent, is on track to achieve nameplate capacity of 4.7 million tonnes at\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2020\/06\/25093537\/South32-illawarra-metallurgical-coal-604x270.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2020\/06\/25093537\/South32-illawarra-metallurgical-coal-604x270.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2020\/06\/25093537\/South32-illawarra-metallurgical-coal-604x270.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":1668,"url":"https:\/\/yinghuiinternational.com\/index.php\/2016\/07\/19\/rio-tinto-releases-second-quarter-production-results\/","url_meta":{"origin":518,"position":5},"title":"Rio Tinto releases second quarter production results","author":"yinghui","date":"July 19, 2016","format":false,"excerpt":"Rio Tinto has seen production increases across the board, seeing a leap in all segments bar coking coal. The miner recorded a 10 per cent increase in iron ore production for the first half of 2016 compared to last year, and an eight per cent increase for the second quarter\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=518"}],"version-history":[{"count":0,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/518\/revisions"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}