{"id":8001,"date":"2021-07-29T14:58:46","date_gmt":"2021-07-29T04:58:46","guid":{"rendered":"http:\/\/yinghuiinternational.com\/?p=8001"},"modified":"2021-07-29T14:58:49","modified_gmt":"2021-07-29T04:58:49","slug":"pilbara-minerals-continues-million-tonne-mission","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2021\/07\/29\/pilbara-minerals-continues-million-tonne-mission\/","title":{"rendered":"Pilbara Minerals continues million-tonne mission"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2019\/11\/05120228\/Pilgangoora-604x270.jpeg\" alt=\"pilbara minerals' pilgangoora lithium operation\"\/><figcaption><em>The Pilgangoora operation. Image: Pilbara Minerals<\/em><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Pilbara Minerals is closer to upgrading its Pilgan plant at the Pilgangoora lithium project in Western Australia, with surging sales and shipments supporting the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Despite producing almost 700 tonnes less than the March quarter, Pilbara shipped a record 95,972 dry metric tonnes (dmt) of spodumene concentrate and exceeded its target of 75,000 \u2013 90,000dmt.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pilbara Minerals managing director Ken Brinsden said in the June quarter\u2019s results presentation that the market for spodumene concentrate was developing in ways not seen for several years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe think Pilbara Minerals is incredibly well-placed to be able to participate in this next phase of growth that\u2019s going on in the industry,\u201d Brindsen said<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe would like to think we have the right combination of productive plant capacity, skills amongst the team to maximise the performance of those facilities \u2013 and that shouldn\u2019t be underestimated because that is very hard-won in the lithium industry.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company produced 77,162dmt and sold a record 109,190dmt of spodumene concentrate for the June quarter, some of which was loaded late in the previous quarter.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pilgangoora has two plants at different stages of operation \u2013 the Pilgan plant and the Ngungaju plant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The former currently operates at around 350,000 tonnes per annum and is set for a 10-15 per cent improvement project during the September quarter.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The latter is set for a stated restart during the December quarter, as Pilbara Minerals targets up to 200,000dmt by mid-2022.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This would see the company producing up to 580,000dmt once everything is up and running at full capacity, while future improvements to the Pilgan plant aim to push Pilgangoora to be a one million tonne per annum operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With such promise on the horizon at Pilbara Minerals, Brinsden said an offtake <strong>agreement with Korean manufacturer POSCO was progressing<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are still optimistic in both the value in that relationship and the skills of the POSCO team,\u201d Brinsden said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe have been frustrated by progress\u2026but nonetheless we are optimistic about the progress of that deal and its relevance to the growth of Pilbara Minerals. We expect to see that progress during the course of next month (August).\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">POSCO recently signed an offtake agreement with Queensland Pacific Metals for 3000 tonnes of nickel and 300 tonnes of cobalt per year from the Townsville Energy Chemicals Hub (TECH) project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Korean company has also signed a memorandum of understanding (MOU) with Rio Tinto to develop low-carbon emission technologies for iron ore mining, further exemplifying its commitment to decarbonisation across a range of commodities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pilbara Minerals is closer to upgrading its Pilgan plant at the Pilgangoora lithium project in Western Australia, with surging sales and shipments supporting the project. Despite producing almost 700 tonnes less than the March quarter, Pilbara shipped a record 95,972 dry metric tonnes (dmt) of spodumene concentrate and exceeded its target of 75,000 \u2013 90,000dmt. &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2021\/07\/29\/pilbara-minerals-continues-million-tonne-mission\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Pilbara Minerals continues million-tonne mission&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[6,34],"tags":[],"class_list":["post-8001","post","type-post","status-publish","format-standard","hentry","category-mines-and-quarry","category-new-tech-new-product"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-253","jetpack-related-posts":[{"id":8050,"url":"https:\/\/yinghuiinternational.com\/index.php\/2021\/09\/06\/mineral-resources-offloads-328-million-pilbara-minerals-interest\/","url_meta":{"origin":8001,"position":0},"title":"Mineral Resources offloads $328 million Pilbara Minerals interest","author":"yinghui","date":"September 6, 2021","format":false,"excerpt":"Mineral Resources has sold its 5.4 per cent stake of Pilbara Minerals in an effort to focus on its hard-rock lithium and iron ore assets. Mineral Resources has been a shareholder in Pilbara Minerals since October 2016 as part of its offtake rights and a royalty held of the Pilgangoora\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"Deloitte","src":"https:\/\/i0.wp.com\/australianresourcesandinvestment.com.au\/wp-content\/uploads\/2021\/07\/shutterstock_750493204-1024x683.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/australianresourcesandinvestment.com.au\/wp-content\/uploads\/2021\/07\/shutterstock_750493204-1024x683.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/australianresourcesandinvestment.com.au\/wp-content\/uploads\/2021\/07\/shutterstock_750493204-1024x683.jpg?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/australianresourcesandinvestment.com.au\/wp-content\/uploads\/2021\/07\/shutterstock_750493204-1024x683.jpg?resize=700%2C400 2x"},"classes":[]},{"id":2121,"url":"https:\/\/yinghuiinternational.com\/index.php\/2017\/01\/19\/rcr-tomlinson-secures-epc-contract-at-pilbara-lithium-project\/","url_meta":{"origin":8001,"position":1},"title":"RCR Tomlinson secures EPC contract at Pilbara lithium project","author":"yinghui","date":"January 19, 2017","format":false,"excerpt":"Lithium developer Pilbara Minerals has awarded an engineering, procurement and construction (EPC) contract at the Pilgangoora project in Western Australia to RCR Tomlinson. The contract, worth a maximum\u00a0$148 million, involves\u00a0the EPC of Pilgangoora\u2019s two million tonnes per annum lithium-tantalum processing plant, including wet-and-dry circuit with concentrator, associated plant and commissioning\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":2299,"url":"https:\/\/yinghuiinternational.com\/index.php\/2017\/03\/29\/lithium-electrifies-the-pilbara\/","url_meta":{"origin":8001,"position":2},"title":"Lithium electrifies the Pilbara","author":"yinghui","date":"March 29, 2017","format":false,"excerpt":"Lithium has undoubtedly been one of the hottest commodities in the world for some time now. Demand from countries like China has grown significantly in the past two years as manufacturers look to increase output of lithium-related technology, such as li-ion batteries, in addition to its more traditional use for\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/d9lhxyivbnow1.cloudfront.net\/wp-content\/uploads\/2017\/03\/28122333\/IMG_0618-1024x683.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/d9lhxyivbnow1.cloudfront.net\/wp-content\/uploads\/2017\/03\/28122333\/IMG_0618-1024x683.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/d9lhxyivbnow1.cloudfront.net\/wp-content\/uploads\/2017\/03\/28122333\/IMG_0618-1024x683.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":8902,"url":"https:\/\/yinghuiinternational.com\/index.php\/2025\/02\/13\/crushing-and-screening-solutions-for-any-setting\/","url_meta":{"origin":8001,"position":3},"title":"Crushing and screening solutions for any setting","author":"yinghui","date":"February 13, 2025","format":false,"excerpt":"Utilising its fleet of mobile and fixed plants, Rapid has tailored its services to align with different kinds of mine outputs. Image: Rapid Crushing & Screening Contractors Rapid Crushing & Screening Contractors has a strong track record of providing tailored solutions that boost productivity. Rapid Crushing & Screening Contractors, one\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Rapid-1024x714.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Rapid-1024x714.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Rapid-1024x714.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Rapid-1024x714.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":2594,"url":"https:\/\/yinghuiinternational.com\/index.php\/2018\/02\/01\/demand-for-mining-services-ramps-up\/","url_meta":{"origin":8001,"position":4},"title":"Demand for mining services ramps up","author":"yinghui","date":"February 1, 2018","format":false,"excerpt":"It was undoubtedly a better year for Australia\u2019s leading mining services companies in 2017. Improved commodity prices led to an increase in mining activity, meaning the expertise of the country\u2019s mining services contractors was in growing demand. Australian Mining\u00a0takes a closer look at some of the companies that were awarded\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1732,"url":"https:\/\/yinghuiinternational.com\/index.php\/2016\/08\/03\/rio-tinto-reinvesting-in-the-pilbara\/","url_meta":{"origin":8001,"position":5},"title":"Rio Tinto reinvesting in the Pilbara","author":"yinghui","date":"August 3, 2016","format":false,"excerpt":"Rio Tinto has announced it will invest $338 million to complete development of its existing Silvergrass iron ore mine. The miner first announced plans for an investment decision in its half yearly reports earlier this year. \u201cThe brownfield expansion of the high-grade Silvergrass mine offers attractive returns, with an expected\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8001","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=8001"}],"version-history":[{"count":1,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8001\/revisions"}],"predecessor-version":[{"id":8002,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8001\/revisions\/8002"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=8001"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=8001"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=8001"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}