{"id":8529,"date":"2024-02-02T16:06:28","date_gmt":"2024-02-02T05:06:28","guid":{"rendered":"https:\/\/yinghuiinternational.com\/?p=8529"},"modified":"2024-02-04T16:08:24","modified_gmt":"2024-02-04T05:08:24","slug":"coal-still-king-for-glencore","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2024\/02\/02\/coal-still-king-for-glencore\/","title":{"rendered":"Coal still king for Glencore"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\"><img loading=\"lazy\" decoding=\"async\" height=\"50\" width=\"50\" srcset=\"https:\/\/secure.gravatar.com\/avatar\/d1700c9ea60efabea01d3ee5bd3bc8e8?s=100&amp;d=mm&amp;r=g 2x\" src=\"https:\/\/secure.gravatar.com\/avatar\/d1700c9ea60efabea01d3ee5bd3bc8e8?s=50&amp;d=mm&amp;r=g\" alt=\"\"><a href=\"https:\/\/www.australianmining.com.au\/author\/alexandra-eastwoodprimecreative-com-au\/\">ALEXANDRA EASTWOOD<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/shutterstock_773326039-1024x683-1.jpg\" alt=\"Wilkie coal\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Coal has emerged as the standout commodity from Glencore\u2019s 2023 full year production report.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While copper, cobalt, zinc and nickel production all experienced a downturn, Glencore\u2019s coal production was three per cent higher than 2022 at 3.6 million tonnes (t).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The number was a reflection of higher productivity in South Africa and a year over year easing in external factors that constrain capacity, such as wet weather and blockades.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nickel production fell by nine per cent to 97,600t, primarily due to the planned shutdown of Glencore\u2019s Murrin Murrin site in WA for routine maintenance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cobalt production was six per cent lower than 2022 at 41,300t and copper production was 48,000t lower than 2022.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Despite the slight donwturn, Glencore chief executive officer Gary Nagle remains positive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>\u201c<\/em>Overall 2023 production was in line with our earlier revised guidance, with stronger second half volumes delivered across our key commodities, including copper, zinc, nickel and coal,\u201d he&nbsp;<a href=\"https:\/\/www.glencore.com\/media-and-insights\/news\/full-year-2023-production-report\" target=\"_blank\" rel=\"noreferrer noopener\">said<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>\u201c<\/em>Compared to 2022, the moderately lower year-on-year copper and zinc department managed production volumes, primarily reflect disposals of the Cobar copper mine and various South American zinc operations.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Looking ahead, Nagle said production is looking steady.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>\u201c<\/em>Coal production is forecast to be steady at the guidance range mid-point of 110 million tonnes, excluding any incremental volumes from the recently announced acquisition of a 77 per cent interest in Teck\u2019s steelmaking coal business, currently going through its various approval processes,\u201d he said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ALEXANDRA EASTWOOD Coal has emerged as the standout commodity from Glencore\u2019s 2023 full year production report. While copper, cobalt, zinc and nickel production all experienced a downturn, Glencore\u2019s coal production was three per cent higher than 2022 at 3.6 million tonnes (t). The number was a reflection of higher productivity in South Africa and a &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2024\/02\/02\/coal-still-king-for-glencore\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Coal still king for Glencore&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[37,6],"tags":[],"class_list":["post-8529","post","type-post","status-publish","format-standard","hentry","category-clients","category-mines-and-quarry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-2dz","jetpack-related-posts":[{"id":1646,"url":"https:\/\/yinghuiinternational.com\/index.php\/2016\/07\/13\/bids-begin-for-glencore-coal-rail-assets\/","url_meta":{"origin":8529,"position":0},"title":"Bids begin for Glencore coal rail assets","author":"yinghui","date":"July 13, 2016","format":false,"excerpt":"Initial bids for Glencore\u2019s Hunter Valley rolling stock and haulage assets are rolling in. Three major logistics companies \u2013 Aurizon, Pacific National, and Genesee Wyoming \u2013 are understood to have begun placing bids for the assets earlier this week, according to the AFR. While a price is yet to be\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"glencore_5.JPG","src":"https:\/\/i0.wp.com\/d9lhxyivbnow1.cloudfront.net\/wp-content\/uploads\/2016\/04\/06050452\/glencore_5-604x270.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/d9lhxyivbnow1.cloudfront.net\/wp-content\/uploads\/2016\/04\/06050452\/glencore_5-604x270.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/d9lhxyivbnow1.cloudfront.net\/wp-content\/uploads\/2016\/04\/06050452\/glencore_5-604x270.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":786,"url":"https:\/\/yinghuiinternational.com\/index.php\/2015\/01\/22\/hughes-drilling-wins-mt-arthur-coal-contract\/","url_meta":{"origin":8529,"position":1},"title":"Hughes Drilling wins Mt Arthur coal contract","author":"yinghui","date":"January 22, 2015","format":false,"excerpt":"Hughes Drilling has won a contract for overburden drilling services at BHP's Mt Arthur coal mine. The contract is only a short term agreement. It will run C-750 REICHdrill rigs on site. This win comes just a day after Hughes won a similar contract for overburden removal at Glencore's Collinsville\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1162,"url":"https:\/\/yinghuiinternational.com\/index.php\/2015\/12\/10\/thiess-win-massive-mongolian-coal-contract-extension\/","url_meta":{"origin":8529,"position":2},"title":"Thiess win massive Mongolian coal contract extension","author":"yinghui","date":"December 10, 2015","format":false,"excerpt":"Thiess have been awarded a four year contract extension for work at Energy Resources\u2019 Mongolian Ukhaa Khudag coal mine. It is understood that it will provide up to $1 billion worth of revenue for the company over the next seven years. This latest agreement builds upon an existing eight year\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"mongolia-1_960-600","src":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2015\/12\/mongolia-1_960-600.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":518,"url":"https:\/\/yinghuiinternational.com\/index.php\/2014\/10\/30\/whitehaven-coal\/","url_meta":{"origin":8529,"position":3},"title":"Whitehaven Coal","author":"yinghui","date":"October 30, 2014","format":false,"excerpt":"Our operations are currently underpinned by our new Narrabri underground operation which commenced longwall production in October 2012, and our three existing open cut mines - all situated in NSW's Gunnedah Basin. Construction has commenced at our Maules Creek project and and approval is being sought for our Vickery project,\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"WhitehavenCoal_Asset_Portfolio","src":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2014\/10\/WhitehavenCoal_Asset_Portfolio.png?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2014\/10\/WhitehavenCoal_Asset_Portfolio.png?resize=350%2C200 1x, https:\/\/i0.wp.com\/www.bnmme.com.au\/wp-content\/uploads\/2014\/10\/WhitehavenCoal_Asset_Portfolio.png?resize=525%2C300 1.5x"},"classes":[]},{"id":8365,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/08\/14\/glencore-shows-off-mt-isa-assets\/","url_meta":{"origin":8529,"position":4},"title":"Glencore shows off Mt Isa assets","author":"yinghui","date":"August 14, 2023","format":false,"excerpt":"ALEXANDRA EASTWOOD Glencore Queensland Metals mines zinc and copper in the Mt Isa region. Image: Glencore Australian Prime Minister Anthony Albanese has visited Glencore\u2019s Mount Isa mines to discuss the importance of metals and minerals. The Mt Isa copper-zinc mines are located in Mount Isa, Queensland, and are home to\u2026","rel":"","context":"In &quot;Gold and Copper&quot;","block_context":{"text":"Gold and Copper","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/goldcopper\/"},"img":{"alt_text":"Resources communities","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2020\/09\/%C2%A9ttlgs0002819-0317-1024x682.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2020\/09\/%C2%A9ttlgs0002819-0317-1024x682.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2020\/09\/%C2%A9ttlgs0002819-0317-1024x682.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2020\/09\/%C2%A9ttlgs0002819-0317-1024x682.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":7999,"url":"https:\/\/yinghuiinternational.com\/index.php\/2021\/07\/21\/south32-longwall-change-improves-illawarra-output\/","url_meta":{"origin":8529,"position":5},"title":"South32 longwall change improves Illawarra output","author":"yinghui","date":"July 21, 2021","format":false,"excerpt":"Illawarra Metallurgical Coal. Image: South32 South32 has improved metallurgical coal production at the Illawarra metallurgical coal operation in New South Wales after returning the site to a three longwall configuration. Illawarra, which is South32\u2019s sole metallurgical coal asset, improved production 9 per cent in the 2021 financial year thanks to\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2020\/06\/25093537\/South32-illawarra-metallurgical-coal-604x270.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2020\/06\/25093537\/South32-illawarra-metallurgical-coal-604x270.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/dszs098s1om2l.cloudfront.net\/australianmining.com.au\/2020\/06\/25093537\/South32-illawarra-metallurgical-coal-604x270.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8529","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=8529"}],"version-history":[{"count":2,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8529\/revisions"}],"predecessor-version":[{"id":8531,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8529\/revisions\/8531"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=8529"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=8529"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=8529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}