{"id":8612,"date":"2024-06-06T10:25:30","date_gmt":"2024-06-06T00:25:30","guid":{"rendered":"https:\/\/yinghuiinternational.com\/?p=8612"},"modified":"2024-06-12T10:41:45","modified_gmt":"2024-06-12T00:41:45","slug":"dolphin-tungsten-volumes-exceed-expectations","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2024\/06\/06\/dolphin-tungsten-volumes-exceed-expectations\/","title":{"rendered":"Dolphin tungsten volumes exceed expectations"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\"><img loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/secure.gravatar.com\/avatar\/b5e08ee8debb849ef78b8c99b82ea005?s=100&amp;d=mm&amp;r=g 2x\" height=\"50\" width=\"50\" src=\"https:\/\/secure.gravatar.com\/avatar\/b5e08ee8debb849ef78b8c99b82ea005?s=50&amp;d=mm&amp;r=g\" alt=\"\"><a href=\"https:\/\/www.australianmining.com.au\/author\/oliviathomson\/\">OLIVIA THOMSON<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/Screen-Shot-2021-11-24-at-10.21.10-am-1024x576-1.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The Dolphin tungsten mine. Image: Group 6 Metals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Group 6 Metals has uncovered more ore tonnes and metric tonne units of tungsten trioxide from the Dolphin tungsten mine than originally anticipated, alongside a record month of shipments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company\u2019s in-pit reconciliation methodology uses in-pit sampling, UV (ultraviolet light) lamping, and production drill hole assaying to compare mining results to the geological model.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When compared to the geological model, recoveries from the Dolphin open pit exceeded expectations up until the end of April.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dolphin produced about 94 dry tonnes of concentrate in April at an average grade of 57.1 per cent for 5380 metric tonne units of tungsten trioxide. A total of 115.05 dry tonnes of concentrate at 57.38 per cent tungsten trioxide was shipped in April, a record month for Group 6.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cOver the past six months, our geology and mining teams have excelled at maximising ore recovery,\u201d Group 6 managing director and chief executive officer Keith McKnight&nbsp;<a href=\"https:\/\/s2.listcorp.com\/asx\/g6m\/group-6-metals-limited\/news\/dolphin-tungsten-mine-operational-activities-update-3040473.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">said<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis means we\u2019ve collected more valuable tungsten ore than forecast while working the outer areas of the Dolphin open pit. While this has caused a temporary delay in the mining sequence, the extra effort has resulted in a detailed understanding of the mine\u2019s geology, giving us a lot of confidence in our mine forecast.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cExcitingly, the high-grade C-lens (deposit) is now accessible at -30 RL (reduced level) in the main Dolphin pit, and production drill assay results confirm the presence of high-grade ore in the mining blocks (is) scheduled for June.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Group 6 has also made progress in sustainability. It, along with Climate Capital, has been looking into integrating a 7.5 megawatt solar panel array and a 5.5 megawatt hour battery storage system at the Dolphin mine\u2019s power plant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Climate Capital has finished power modelling and an extensive site assessment. If implemented, the solar power system would sit adjacent to Group 6\u2019s process plant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Group 6 and Climate Capital are expected to negotiate a power purchase agreement under a build own operate model to deliver the solar project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After being closed for three decades, the Dolphin tungsten mine&nbsp;<a href=\"https:\/\/www.australianmining.com.au\/dolphin-tungsten-mine-re-opens\/\" target=\"_blank\" rel=\"noreferrer noopener\">officially re-opened<\/a>&nbsp;in August 2023. It is located near Grassy, a town on the south-east coast of King Island.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>OLIVIA THOMSON The Dolphin tungsten mine. Image: Group 6 Metals. Group 6 Metals has uncovered more ore tonnes and metric tonne units of tungsten trioxide from the Dolphin tungsten mine than originally anticipated, alongside a record month of shipments. The company\u2019s in-pit reconciliation methodology uses in-pit sampling, UV (ultraviolet light) lamping, and production drill hole &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2024\/06\/06\/dolphin-tungsten-volumes-exceed-expectations\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Dolphin tungsten volumes exceed expectations&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[37,6,207],"tags":[],"class_list":["post-8612","post","type-post","status-publish","format-standard","hentry","category-clients","category-mines-and-quarry","category-slurry-pump-2"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-2eU","jetpack-related-posts":[{"id":8964,"url":"https:\/\/yinghuiinternational.com\/index.php\/2025\/05\/28\/tasmanian-government-backs-tungsten-mine\/","url_meta":{"origin":8612,"position":0},"title":"Tasmanian Government backs tungsten mine","author":"yinghui","date":"May 28, 2025","format":false,"excerpt":"Dylan Brown Group 6\u2019s Dolphin tungsten mine in King Island, Tasmania. Image: Group 6 Metals The Tasmanian Government has issued a new $7.5 million loan to Group 6 Metals (G6M) to help stabilise operations at its Dolphin tungsten mine on King Island. The financial support follows the Tasmanian Government\u2019s recent\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/08\/Screenshot-2024-08-09-at-2.51.36%E2%80%AFPM-1024x727.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/08\/Screenshot-2024-08-09-at-2.51.36%E2%80%AFPM-1024x727.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/08\/Screenshot-2024-08-09-at-2.51.36%E2%80%AFPM-1024x727.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/08\/Screenshot-2024-08-09-at-2.51.36%E2%80%AFPM-1024x727.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8566,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/05\/08\/queensland-invests-millions-in-critical-minerals-mine-expansion\/","url_meta":{"origin":8612,"position":1},"title":"Queensland invests millions in critical minerals mine expansion","author":"yinghui","date":"May 8, 2024","format":false,"excerpt":"KELSIE TIBBEN Tungsten is considered a critical mineral under Australia's Critical Minerals List. Image: Wirestock Creators\/shutterstock.com The Queensland Investment Corporation (QIC) will fund the expansion of EQ Resources\u2019 (EQR) Mount Carbine tungsten mine in the state\u2019s north with a $20 million loan. The funding comes from the Queensland Critical Minerals\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"Queensland critical minerals","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/02\/shutterstock_1871949409-1024x680.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/02\/shutterstock_1871949409-1024x680.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/02\/shutterstock_1871949409-1024x680.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/02\/shutterstock_1871949409-1024x680.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8741,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/06\/25\/eq-hits-tungsten-production-high\/","url_meta":{"origin":8612,"position":2},"title":"EQ hits tungsten production high","author":"yinghui","date":"June 25, 2024","format":false,"excerpt":"OLIVIA THOMSON Tungsten. Image: Bj\u00f6rn Wylezich\/stock.adobe.com EQ Resources hit new weekly production records in June at its Mount Carbine and Saloro tungsten operations in Queensland and Spain respectively. The Mount Carbine operations produced a record 70.4 tonnes of 50 per cent tungsten oxide (WO3) concentrate over a seven-day production period,\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"tungsten","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/04\/Screenshot-2024-04-12-at-7.59.49-am-1024x680.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/04\/Screenshot-2024-04-12-at-7.59.49-am-1024x680.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/04\/Screenshot-2024-04-12-at-7.59.49-am-1024x680.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/04\/Screenshot-2024-04-12-at-7.59.49-am-1024x680.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8596,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/05\/23\/sandvik-carbide-recycling-program\/","url_meta":{"origin":8612,"position":3},"title":"Sandvik Carbide Recycling Program","author":"yinghui","date":"May 23, 2024","format":false,"excerpt":"ALEXANDRA EASTWOOD Image: Sandvik The Sandvik Mining and Rock Solutions rock tools team are helping to set the industry standard for circularity of rock tools and their operations. Currently, Sandvik is one of the only original equipment manufacturers (OEMs) who recycles tungsten carbide across the world through its Carbide Recycling\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/yinghuiinternational.com\/wp-content\/uploads\/2024\/05\/sandvik-carbide-recycling-progra.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":943,"url":"https:\/\/yinghuiinternational.com\/index.php\/2015\/08\/18\/quarry-wear-parts-supplier-lands-new-distribution-deal\/","url_meta":{"origin":8612,"position":4},"title":"QUARRY WEAR PARTS SUPPLIER LANDS NEW DISTRIBUTION DEAL","author":"yinghui","date":"August 18, 2015","format":false,"excerpt":"A quarry wear parts specialist has extended its range by signing an exclusive distribution deal with an Australian wear plate supplier. Perth-based business Crushing and Mining Equipment (CME) has secured the sole distribution rights to Austral Technologies\u2019 tungsten carbide wear plate product SPOT60. Under the agreement, CME will distribute the\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8918,"url":"https:\/\/yinghuiinternational.com\/index.php\/2025\/02\/21\/minprovise-further-expands-wear-parts-and-liners-supply\/","url_meta":{"origin":8612,"position":5},"title":"Minprovise further expands wear parts and liners supply","author":"yinghui","date":"February 21, 2025","format":false,"excerpt":"Staff Writer Image: Minprovise Minprovise, a leading supplier in the mining and quarrying industries, has recently expanded its product range to include a variety of wear parts and liners. This new offering includes high-quality manganese crusher liners, apron feeder pans and jaw crusher wear parts. The new range of high-performance\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Chocky-Blocks-MPV_2-300x167.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=8612"}],"version-history":[{"count":1,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8612\/revisions"}],"predecessor-version":[{"id":8613,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8612\/revisions\/8613"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=8612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=8612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=8612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}