{"id":8725,"date":"2024-06-19T20:30:13","date_gmt":"2024-06-19T10:30:13","guid":{"rendered":"https:\/\/yinghuiinternational.com\/?p=8725"},"modified":"2024-06-19T20:30:14","modified_gmt":"2024-06-19T10:30:14","slug":"bhp-copper-is-king","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2024\/06\/19\/bhp-copper-is-king\/","title":{"rendered":"BHP: Copper is king"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\"><img loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/secure.gravatar.com\/avatar\/62df330bfb9120a09053fca176edce0b?s=100&amp;d=mm&amp;r=g 2x\" height=\"50\" width=\"50\" src=\"https:\/\/secure.gravatar.com\/avatar\/62df330bfb9120a09053fca176edce0b?s=50&amp;d=mm&amp;r=g\" alt=\"\"><a href=\"https:\/\/www.australianmining.com.au\/author\/kelsie-harford\/\">KELSIE TIBBEN<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.australianmining.com.au\/wp-content\/uploads\/2024\/06\/Screenshot-2024-06-03-at-1.21.28%E2%80%AFPM-1024x623.png\" alt=\"\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">BHP asset president copper South Australia Anna Wiley. Image: Austmine<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BHP South Australian copper asset president Anna Wiley has laid out a copper-focused future for the Big Australian in her address to the Copper to the World conference in SA.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Wiley said <strong>SA is home to 70 per cent of Australia\u2019s copper resource<\/strong>s, one of only so many world-class copper resources remaining in the world.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis places additional importance on ensuring we economically extract as much copper as possible from our current operations,\u201d she&nbsp;<a href=\"https:\/\/www.bhp.com\/news\/media-centre\/reports-presentations\/2024\/06\/anna-wiley-at-copper-to-the-world-conference\" target=\"_blank\" rel=\"noreferrer noopener\">told<\/a>&nbsp;the audience.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Citing BHP\u2019s Chile and South American operations, Wiley added the company\u2019s South Australian foothold to the list of assets part of its plan for a future focused on copper.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It\u2019s a plan that has been in the works for a while, culminating in BHP\u2019s&nbsp;<a href=\"https:\/\/www.australianmining.com.au\/bhp-passes-final-hurdle-for-oz-minerals-takeover\/\" target=\"_blank\" rel=\"noreferrer noopener\">$9.7 billion acquisition of OZ Minerals last year<\/a>, bringing the SA Carrapateena and West Musgrave copper projects into the BHP fold.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cToday, as BHP we operate three underground copper mines and a nationally significant smelter and refinery complex in South Australia\u2019s far north,\u201d Wiley said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This includes the heart of BHP\u2019s SA copper province, <strong>Olympic Dam<\/strong>, which Wiley said the company is hoping to grow with the help of additional smelting and refining plants.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIt\u2019s a big operation \u2013 and it\u2019s getting bigger,\u201d she said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis has the potential to result in production of greater than 500 kilotonnes per annum of copper \u2013 and more than 700 kilotonnes of copper equivalent per annum when you include the by-products of gold, silver and uranium.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis would constitute one of the most significant investments in copper metal manufacturing infrastructure in Australia for many decades.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Wiley said BHP\u2019s plan for growth relies on a range of elements coming together, like skills development, the mining equipment, technology and services (METS) sector, permitting and approvals, enabling infrastructure, underlying stability, and technology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cBut in one way or another they all boil down to one very important theme: partnership and collaboration,\u201d she said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIn recent memory it was impossible to imagine change of this pace in the mining industry, and it goes to show that amazing things can be achieved with a common ambition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIndustry, governments, Traditional Owners, technology providers and communities working together will help bring more copper supply to market to meet global demand more quickly and more sustainably.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Subscribe to&nbsp;<\/em><a href=\"https:\/\/www.australianmining.com.au\/newsletter\" target=\"_blank\" rel=\"noreferrer noopener\"><em>Australian Mining<\/em><\/a><em>&nbsp;and receive the latest news on product announcements, industry developments, commodities and more.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>KELSIE TIBBEN BHP asset president copper South Australia Anna Wiley. Image: Austmine BHP South Australian copper asset president Anna Wiley has laid out a copper-focused future for the Big Australian in her address to the Copper to the World conference in SA. Wiley said SA is home to 70 per cent of Australia\u2019s copper resources, &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2024\/06\/19\/bhp-copper-is-king\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;BHP: Copper is king&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[37,206],"tags":[],"class_list":["post-8725","post","type-post","status-publish","format-standard","hentry","category-clients","category-goldcopper"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-2gJ","jetpack-related-posts":[{"id":8733,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/06\/21\/how-bhp-looks-to-prolong-an-iconic-australian-copper-mine\/","url_meta":{"origin":8725,"position":0},"title":"How BHP looks to prolong an iconic Australian copper mine","author":"yinghui","date":"June 21, 2024","format":false,"excerpt":"TIM BOND Anna Wiley speaking at Copper to the World 2024. Image: Austmine BHP\u2019s planned expansion of Olympic Dam could be one of the most significant investments in Australian copper infrastructure in decades. Speaking at the recent Copper to the World conference, BHP asset president copper Anna Wiley discussed the\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"Olympic Dam","src":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2024\/06\/0R9A3486-sml-1024x683.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2024\/06\/0R9A3486-sml-1024x683.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2024\/06\/0R9A3486-sml-1024x683.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2024\/06\/0R9A3486-sml-1024x683.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8536,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/02\/27\/significant-high-copper-grades-unlocked-at-oak-dam\/","url_meta":{"origin":8725,"position":1},"title":"Significant high copper grades unlocked at Oak Dam","author":"yinghui","date":"February 27, 2024","format":false,"excerpt":"OLIVIA THOMSON Image: Phawat\/stock.adobe.com An exploration program undertaken by BHP at its Oak Dam copper deposit has identified high-grades of copper deep beneath the Olympic Dam ore body, with some grades equalling more than two per cent. The Oak Dam deposit is located 65km south-east of the Olympic Dam mine\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"true north copper","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/Screenshot-2024-01-24-at-7.58.13%E2%80%AFam-1024x588.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/Screenshot-2024-01-24-at-7.58.13%E2%80%AFam-1024x588.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/Screenshot-2024-01-24-at-7.58.13%E2%80%AFam-1024x588.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/Screenshot-2024-01-24-at-7.58.13%E2%80%AFam-1024x588.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":3296,"url":"https:\/\/yinghuiinternational.com\/index.php\/2019\/02\/15\/bhp-seeks-75-copper-growth-project-at-olympic-dam\/","url_meta":{"origin":8725,"position":2},"title":"BHP seeks 75% copper growth project at Olympic Dam","author":"yinghui","date":"February 15, 2019","format":false,"excerpt":"BHP\u2019s growth aspirations to significantly increase copper output at Olympic Dam have been recognised by the South Australian Government with major development status. The miner hopes to expand Olympic Dam\u2019s copper production by 75 per cent, from 200,000 tonnes per annum to 350,000 tonnes per annum. BHP is progressing its\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8810,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/08\/30\/is-south-australia-the-worlds-next-copper-leader\/","url_meta":{"origin":8725,"position":3},"title":"Is South Australia the world\u2019s next copper leader?","author":"yinghui","date":"August 30, 2024","format":false,"excerpt":"Kelsie Tibben The Olympic Dam operation. Image: BHP The South Australian Chamber of Mines and Energy (SACOME) has weighed in on BHP\u2019s plan to more than double its copper production in the state by 2030. BHP plans to upgrade its Olympic Dam copper smelter to a \u2018stage-two smelter\u2019, as well\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"South Australia copper","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2020\/05\/171113_OlympicDamDusk_LQ-1024x576.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2020\/05\/171113_OlympicDamDusk_LQ-1024x576.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2020\/05\/171113_OlympicDamDusk_LQ-1024x576.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2020\/05\/171113_OlympicDamDusk_LQ-1024x576.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8316,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/07\/20\/copper-south-australia-the-bhp-era-begins\/","url_meta":{"origin":8725,"position":4},"title":"\u2018Copper South Australia\u2019: The BHP era begins","author":"yinghui","date":"July 20, 2023","format":false,"excerpt":"TOM PARKER The Carrapateena operation in South Australia. BHP had plenty of news in its June quarterly, including first production results from the\u00a0newly acquired Prominent Hill and Carrapateena mines\u00a0in South Australia. The major miner also revealed annual production records at Western Australian Iron Ore (WAIO), the Olympic Dam operation, and\u2026","rel":"","context":"In &quot;Gold and Copper&quot;","block_context":{"text":"Gold and Copper","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/goldcopper\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8273,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/05\/11\/putting-south-australia-on-the-global-copper-map\/","url_meta":{"origin":8725,"position":5},"title":"Putting South Australia on the global copper map","author":"yinghui","date":"May 11, 2023","format":false,"excerpt":"TOM PARKER The Carrapateena operation in South Australia. Image: OZ Minerals BHP has shed more light on its plans for South Australia after recently acquiring OZ Minerals and its Prominent Hill and Carrapateena copper mines. \u201cGlobally, BHP has the largest copper endowment of any company, based on ownership interest,\u201d BHP\u2026","rel":"","context":"In &quot;Gold and Copper&quot;","block_context":{"text":"Gold and Copper","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/goldcopper\/"},"img":{"alt_text":"BHP South Australia","src":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/05\/190913_CarrapateenaSiteAView3_1200x675-1024x576.jpeg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/05\/190913_CarrapateenaSiteAView3_1200x675-1024x576.jpeg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/05\/190913_CarrapateenaSiteAView3_1200x675-1024x576.jpeg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/05\/190913_CarrapateenaSiteAView3_1200x675-1024x576.jpeg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8725","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=8725"}],"version-history":[{"count":1,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8725\/revisions"}],"predecessor-version":[{"id":8726,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8725\/revisions\/8726"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=8725"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=8725"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=8725"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}