{"id":8810,"date":"2024-08-30T07:45:47","date_gmt":"2024-08-29T21:45:47","guid":{"rendered":"https:\/\/yinghuiinternational.com\/?p=8810"},"modified":"2024-09-01T07:46:58","modified_gmt":"2024-08-31T21:46:58","slug":"is-south-australia-the-worlds-next-copper-leader","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2024\/08\/30\/is-south-australia-the-worlds-next-copper-leader\/","title":{"rendered":"Is South Australia the world\u2019s next copper leader?"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\"><img loading=\"lazy\" decoding=\"async\" height=\"50\" width=\"50\" srcset=\"https:\/\/secure.gravatar.com\/avatar\/62df330bfb9120a09053fca176edce0b?s=100&amp;d=mm&amp;r=g 2x\" src=\"https:\/\/secure.gravatar.com\/avatar\/62df330bfb9120a09053fca176edce0b?s=50&amp;d=mm&amp;r=g\" alt=\"\"><a href=\"https:\/\/www.australianmining.com.au\/author\/kelsie-harford\/\">Kelsie Tibben<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.australianmining.com.au\/wp-content\/uploads\/2020\/05\/171113_OlympicDamDusk_LQ-1024x576.jpg\" alt=\"South Australia copper\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The Olympic Dam operation. Image: BHP<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The South Australian Chamber of Mines and Energy (SACOME) has weighed in on BHP\u2019s plan to more than double its copper production in the state by 2030.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BHP plans to upgrade its Olympic Dam copper smelter to a \u2018stage-two smelter\u2019, as well as expand its refining capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As one of <strong>only two copper smelters in Australia<\/strong>, the expansion will be a potential boon for the state.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cSouth Australia was known as \u2018The Copper Kingdom\u2019 in the 1840s when copper was first discovered,\u201d SACOME chief executive officer Rebecca Knol&nbsp;<a href=\"https:\/\/www.sacome.org.au\/uploads\/1\/1\/3\/2\/113283509\/sacome_gazettal_bhp_smelter_2024_final.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">said<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cToday\u2019s copper renaissance is crucial to our everyday lives and to our energy transition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cFrom EVs (electric vehicles) and charging stations to mobile devices and life-saving healthcare, copper is fuelling our lives and our net-zero ambitions.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>In SA, BHP currently operates the Carrapateena, Olympic Dam, Prominent Hill, and Oak Dam copper mines.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Big Australian&nbsp;<a href=\"https:\/\/www.australianmining.com.au\/bhp-copper-is-king\/\" target=\"_blank\" rel=\"noreferrer noopener\">has been outspoken<\/a>&nbsp;in its desire to become a global copper powerhouse, and has placed its focus directly on SA.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">SACOME said it is essential for state and Federal governments to ensure BHP\u2019s strategy for the smelter and refinery expansion becomes a reality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There are now several steps that need to be undertaken to advance the project, including an Environment Protection and Biodiversity Conservation determination, development of Terms of Reference, and the preparation of an environmental impact assessment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201c(This) is a significant milestone in BHP\u2019s proposed smelter and refinery expansion, which aims to position SA as a leading global copper jurisdiction,\u201d Knol said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe&nbsp;<a href=\"https:\/\/www.stateprosperity.sa.gov.au\/the-opportunity\" target=\"_blank\" rel=\"noreferrer noopener\">State Prosperity Project<\/a>&nbsp;has provided a framework for strategic development that enables value-add to South Australia\u2019s already impressive resource endowment.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The State Prosperity Project is a co-ordinated initiative by the SA Government to unlock the full potential of renewable energy, critical minerals and green manufacturing to herald a new era of prosperity for South Australia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project\u2019s key focus is the Upper Spencer Gulf, with the SA Government investing jobs and training in the region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Subscribe to&nbsp;<\/em><a href=\"https:\/\/www.australianmining.com.au\/newsletter\" target=\"_blank\" rel=\"noreferrer noopener\"><em>Australian Mining<\/em><\/a><em>&nbsp;and receive the latest news on product announcements, industry developments, commodities and more.<\/em><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Share this article<\/h4>\n","protected":false},"excerpt":{"rendered":"<p>Kelsie Tibben The Olympic Dam operation. Image: BHP The South Australian Chamber of Mines and Energy (SACOME) has weighed in on BHP\u2019s plan to more than double its copper production in the state by 2030. BHP plans to upgrade its Olympic Dam copper smelter to a \u2018stage-two smelter\u2019, as well as expand its refining capacity. &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2024\/08\/30\/is-south-australia-the-worlds-next-copper-leader\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Is South Australia the world\u2019s next copper leader?&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[37,6],"tags":[],"class_list":["post-8810","post","type-post","status-publish","format-standard","hentry","category-clients","category-mines-and-quarry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-2i6","jetpack-related-posts":[{"id":8536,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/02\/27\/significant-high-copper-grades-unlocked-at-oak-dam\/","url_meta":{"origin":8810,"position":0},"title":"Significant high copper grades unlocked at Oak Dam","author":"yinghui","date":"February 27, 2024","format":false,"excerpt":"OLIVIA THOMSON Image: Phawat\/stock.adobe.com An exploration program undertaken by BHP at its Oak Dam copper deposit has identified high-grades of copper deep beneath the Olympic Dam ore body, with some grades equalling more than two per cent. The Oak Dam deposit is located 65km south-east of the Olympic Dam mine\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"true north copper","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/Screenshot-2024-01-24-at-7.58.13%E2%80%AFam-1024x588.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/Screenshot-2024-01-24-at-7.58.13%E2%80%AFam-1024x588.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/Screenshot-2024-01-24-at-7.58.13%E2%80%AFam-1024x588.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2024\/01\/Screenshot-2024-01-24-at-7.58.13%E2%80%AFam-1024x588.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8316,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/07\/20\/copper-south-australia-the-bhp-era-begins\/","url_meta":{"origin":8810,"position":1},"title":"\u2018Copper South Australia\u2019: The BHP era begins","author":"yinghui","date":"July 20, 2023","format":false,"excerpt":"TOM PARKER The Carrapateena operation in South Australia. BHP had plenty of news in its June quarterly, including first production results from the\u00a0newly acquired Prominent Hill and Carrapateena mines\u00a0in South Australia. The major miner also revealed annual production records at Western Australian Iron Ore (WAIO), the Olympic Dam operation, and\u2026","rel":"","context":"In &quot;Gold and Copper&quot;","block_context":{"text":"Gold and Copper","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/goldcopper\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":9009,"url":"https:\/\/yinghuiinternational.com\/index.php\/2025\/09\/19\/bhp-flags-minor-re-sequencing-at-olympic-dam\/","url_meta":{"origin":8810,"position":2},"title":"BHP flags \u2018minor re-sequencing\u2019 at Olympic Dam","author":"yinghui","date":"September 19, 2025","format":false,"excerpt":"Dylan Brown The Olympic Dam mine in South Australia. Source: BHP BHP has provided an update on the progress of its Olympic Dam expansion, with a maintenance campaign to occur two years from now. BHP chief financial officer Vanita Pant said the company remained committed to growing production in the\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/yinghuiinternational.com\/wp-content\/uploads\/2025\/09\/bhp-flags-minor-re-sequencing-at.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":3296,"url":"https:\/\/yinghuiinternational.com\/index.php\/2019\/02\/15\/bhp-seeks-75-copper-growth-project-at-olympic-dam\/","url_meta":{"origin":8810,"position":3},"title":"BHP seeks 75% copper growth project at Olympic Dam","author":"yinghui","date":"February 15, 2019","format":false,"excerpt":"BHP\u2019s growth aspirations to significantly increase copper output at Olympic Dam have been recognised by the South Australian Government with major development status. The miner hopes to expand Olympic Dam\u2019s copper production by 75 per cent, from 200,000 tonnes per annum to 350,000 tonnes per annum. BHP is progressing its\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8273,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/05\/11\/putting-south-australia-on-the-global-copper-map\/","url_meta":{"origin":8810,"position":4},"title":"Putting South Australia on the global copper map","author":"yinghui","date":"May 11, 2023","format":false,"excerpt":"TOM PARKER The Carrapateena operation in South Australia. Image: OZ Minerals BHP has shed more light on its plans for South Australia after recently acquiring OZ Minerals and its Prominent Hill and Carrapateena copper mines. \u201cGlobally, BHP has the largest copper endowment of any company, based on ownership interest,\u201d BHP\u2026","rel":"","context":"In &quot;Gold and Copper&quot;","block_context":{"text":"Gold and Copper","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/goldcopper\/"},"img":{"alt_text":"BHP South Australia","src":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/05\/190913_CarrapateenaSiteAView3_1200x675-1024x576.jpeg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/05\/190913_CarrapateenaSiteAView3_1200x675-1024x576.jpeg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/05\/190913_CarrapateenaSiteAView3_1200x675-1024x576.jpeg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2023\/05\/190913_CarrapateenaSiteAView3_1200x675-1024x576.jpeg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8733,"url":"https:\/\/yinghuiinternational.com\/index.php\/2024\/06\/21\/how-bhp-looks-to-prolong-an-iconic-australian-copper-mine\/","url_meta":{"origin":8810,"position":5},"title":"How BHP looks to prolong an iconic Australian copper mine","author":"yinghui","date":"June 21, 2024","format":false,"excerpt":"TIM BOND Anna Wiley speaking at Copper to the World 2024. Image: Austmine BHP\u2019s planned expansion of Olympic Dam could be one of the most significant investments in Australian copper infrastructure in decades. Speaking at the recent Copper to the World conference, BHP asset president copper Anna Wiley discussed the\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"Olympic Dam","src":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2024\/06\/0R9A3486-sml-1024x683.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2024\/06\/0R9A3486-sml-1024x683.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2024\/06\/0R9A3486-sml-1024x683.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianresourcesandinvestment.com.au\/wp-content\/uploads\/2024\/06\/0R9A3486-sml-1024x683.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8810","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=8810"}],"version-history":[{"count":2,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8810\/revisions"}],"predecessor-version":[{"id":8813,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8810\/revisions\/8813"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=8810"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=8810"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=8810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}