{"id":8908,"date":"2025-02-11T19:32:00","date_gmt":"2025-02-11T08:32:00","guid":{"rendered":"https:\/\/yinghuiinternational.com\/?p=8908"},"modified":"2025-02-16T19:37:15","modified_gmt":"2025-02-16T08:37:15","slug":"a-gold-standard-crushing-and-screening-performance-at-agnew","status":"publish","type":"post","link":"https:\/\/yinghuiinternational.com\/index.php\/2025\/02\/11\/a-gold-standard-crushing-and-screening-performance-at-agnew\/","title":{"rendered":"A gold-standard crushing and screening performance at Agnew"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\"><img loading=\"lazy\" decoding=\"async\" height=\"50\" width=\"50\" srcset=\"https:\/\/secure.gravatar.com\/avatar\/58a93fa916cadffd91ef50efc14337e5?s=100&amp;d=mm&amp;r=g 2x\" src=\"https:\/\/secure.gravatar.com\/avatar\/58a93fa916cadffd91ef50efc14337e5?s=50&amp;d=mm&amp;r=g\" alt=\"\"><a href=\"https:\/\/www.australianmining.com.au\/author\/pcm_admin\/\">Staff Writer<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/sandvik-e1739318757709-1024x678.png\" alt=\"\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A New crushing and screening plant at Agnew Gold is delivering financial rewards to Gold Fields. Image: Sandvik<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>A new Sandvik crushing and screening plant at Gold Fields\u2019 Agnew gold mine in WA is delivering greater efficiency, throughput and operational safety.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Gold Fields Limited is one of the world\u2019s largest gold mining companies with nine operating mines, located in Australia, South Africa, Ghana, Peru and Chile.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Agnew gold mine is one of four Australian gold mines operated by Gold Fields. The site is situated approximately 375km north of Kalgoorlie and has a long history of gold production dating back to the late 1970s.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The mine is best known for its underground operations, primarily targeting the Agnew and Lawler gold deposits. Ore is extracted using a combination of underground and surface mining and is then processed on-site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Around 2018, with the mine expanding into a third underground source, there was a need to increase plant throughput. The 21-year-old tertiary crushing circuit, which was suffering from poor reliability, was unable to meet the demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gold Fields metallurgy manager Reg Radford is the company\u2019s technical expert in the field of processing metallurgy. He works with process managers across all Gold Fields sites in Australia to assist in optimising&nbsp;operations.<\/p>\n\n\n\n<figure class=\"wp-block-image\" id=\"attachment_323730\"><img decoding=\"async\" src=\"https:\/\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/RR-291x300.png\" alt=\"\" class=\"wp-image-323730\"\/><figcaption class=\"wp-element-caption\">Gold Fields metallurgy manager Reg Radford.<br>Image: Sandvik<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Radford could see that the crushing and screening circuit was not in keeping with the company\u2019s broader standards.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIt was working to its limits, and if you compared it to other Gold Fields sites, it was not to the standard that would be accepted elsewhere,\u201d he said. \u201cIt didn\u2019t meet our criterion for a well-organised, safe, professional gold processing operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe equipment was old, and there was little or no spare parts availability. From a metallurgical perspective, it was being pushed to its limits to deliver the tonnage required. At best it was giving us an 8\u201310mm output, which was putting pressure on the downstream grinding circuit.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The age and complexity of the existing plant also meant that access for operation and maintenance was difficult, presenting potential safety concerns.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Seeking a complete solution<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The existing crushers were reaching end-of-life, and rather than just replacing them, it was decided to build an entirely&nbsp;new crushing and screening&nbsp;circuit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To do this, and address various other concerns regarding the existing plant, a comprehensive upgrade project, known as the Agnew Stage 1 upgrade, was&nbsp;conceived.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The initiative examined bespoke and modular designs that could replace the existing plant. The project aimed to improve site water drainage and dust management (by installing a fine ore bin) while minimising disruptions during construction and commissioning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gold Fields manager \u2013 processing Tristan Freemantle was appointed as project director for the upgrade at Agnew. A veteran of the gold and copper industry, Freemantle originally worked for Barrick Gold and then transferred to Gold Fields around 12 years ago.<\/p>\n\n\n\n<figure class=\"wp-block-image\" id=\"attachment_323731\"><img decoding=\"async\" src=\"https:\/\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/TF-279x300.png\" alt=\"\" class=\"wp-image-323731\"\/><figcaption class=\"wp-element-caption\">Gold Fields manager \u2013 processing Tristan Freemantle.<br>Image: Sandvik<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Since then, he has worked across several of Gold Fields\u2019 Australian sites and is currently based at Gruyere, a joint venture project with Gold Road Resources in the Yilgarn area of WA.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cAgnew\u2019s mine life had been extended for a further eight years, so upgrading the crushing and screening circuit was important to increase our processing capabilities: we needed to be in a position to process more ore from the new third&nbsp;mine coming online,\u201d Freemantle said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gold Fields has enjoyed a longstanding relationship with&nbsp;<a href=\"https:\/\/www.rocktechnology.sandvik\/en\/?creative=473258666583&amp;keyword=sandvik&amp;matchtype=e&amp;network=g&amp;device=c&amp;utm_source=google&amp;utm_medium=cpc&amp;utm_campaign=ADM_-_Global_Digital_-_General_-_Branded_-_Australia&amp;utm_term=sandvik&amp;utm_content=473258666583&amp;gclid=CjwKCAiA5Ka9BhB5EiwA1ZVtvANpmbgqIxF1J4LVVW06JfTkuZ7lUIVWJF2IBVe5b_zUwyQCe9K2vhoCIw0QAvD_BwE&amp;gad_source=1\" target=\"_blank\" rel=\"noreferrer noopener\">Sandvik<\/a>, with the company having Sandvik crushers installed at both their St Ives and Granny Smith operations. After considering a bespoke solution, the Gold Fields team chose to go with a Sandvik modular plant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe needed a circuit that was simple, low maintenance and reliable, but also wanted the best crushers and screens that we could get,\u201d Freemantle said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cSandvik showed a willingness to work with us within our parameters. Initially, it was just the crushers and screens, but in the end, they presented a complete plant design, which was modular and comparable with the bespoke designs we were considering.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cSandvik was also able to accommodate our desire to manage our own electrical and process control&nbsp;design.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A key to the successful implementation was Sandvik\u2019s expertise in crushing and modular plant design combined with the screening know-how of Schenck Process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The scope of supply included a Sandvik reciprocating plate feeder, grizzly screen, jaw crusher, and two cone crushers, as well as a Schenck Process double-deck banana screen <\/strong>fitted with Screenex screening media. Sandvik also provided bins, chute work, associated wear protection, and conveyors.<\/p>\n\n\n\n<figure class=\"wp-block-image\" id=\"attachment_323732\"><img decoding=\"async\" src=\"https:\/\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Agnew-300x193.png\" alt=\"\" class=\"wp-image-323732\"\/><figcaption class=\"wp-element-caption\">Sandvik 800i series cone crushers perform secondary and tertiary crushing functions at Agnew.<br>Image: Sandvik<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The innovative plant design eliminated the need for two screening stations and associated conveyors when compared with other proposed designs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cHaving a single vendor was an advantage,\u201d Radford said. \u201cSandvik\u2019s initial designs and 3D models were quite detailed and comprehensive, which was encouraging. It gave us confidence in the circuit because we knew exactly how the proposed layout would interact with the existing plant.\u201d<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Changeover challenges<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">A significant challenge for the project team was that Gold Fields needed the new plant to be installed in parallel with the old one so that, ideally, there would be zero downtime.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cAgnew can\u2019t afford to be down for two or three weeks,\u201d Radford said. \u201cThe mill is pushed to its limits, so it has little ability to catch up.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cSolving this problem \u2013 where we could build the new circuit and how to tie it in \u2013 was a good part of the success&nbsp;story. Commissioning on-time and within budget, with limited downtime, was a very important part of&nbsp;the brief.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To accommodate this requirement, the team decided to move the run-of-mine (ROM) pad and build the new&nbsp;circuit on the site of the old ROM pad. While this achieved the brief of zero downtime, it introduced a new&nbsp;challenge.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The geology of the ROM pad was untested, and some contractors argued that a substantial concrete foundation would be required to support the crushing and screening plant, greatly&nbsp;increasing both the build time and cost.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the end, working with Gold Fields geotech consultants, Sandvik\u2019s design team resolved this problem by delivering a support structure for the new circuit that was strong and rigid enough to reduce the concrete foundations&nbsp;required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>This feature appeared in the&nbsp;<a href=\"https:\/\/www.australianmining.com.au\/magazine\/\" target=\"_blank\" rel=\"noreferrer noopener\">February 2025 issue of Australian Mining<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Staff Writer A New crushing and screening plant at Agnew Gold is delivering financial rewards to Gold Fields. Image: Sandvik A new Sandvik crushing and screening plant at Gold Fields\u2019 Agnew gold mine in WA is delivering greater efficiency, throughput and operational safety. Gold Fields Limited is one of the world\u2019s largest gold mining companies &hellip; <a href=\"https:\/\/yinghuiinternational.com\/index.php\/2025\/02\/11\/a-gold-standard-crushing-and-screening-performance-at-agnew\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;A gold-standard crushing and screening performance at Agnew&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[37,6,7],"tags":[],"class_list":["post-8908","post","type-post","status-publish","format-standard","hentry","category-clients","category-mines-and-quarry","category-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p83F9T-2jG","jetpack-related-posts":[{"id":8980,"url":"https:\/\/yinghuiinternational.com\/index.php\/2025\/04\/25\/sandvik-mobile-crushing-and-screening-unveils-the-qh443e\/","url_meta":{"origin":8908,"position":0},"title":"Sandvik Mobile Crushing and Screening unveils the QH443E","author":"yinghui","date":"April 25, 2025","format":false,"excerpt":"Sandvik Mobile Crushing and Screening is proud to announce the launch of the QH443E. Image: Sandvik Share on FacebookShare on Twitter Sandvik Mobile Crushing and Screening is proud to announce the launch of the QH443E, the latest innovation in tracked cone crushers. This new electric unit has been designed with\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/yinghuiinternational.com\/wp-content\/uploads\/2025\/06\/sandvik-mobile-crushing-and-scre.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/yinghuiinternational.com\/wp-content\/uploads\/2025\/06\/sandvik-mobile-crushing-and-scre.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/yinghuiinternational.com\/wp-content\/uploads\/2025\/06\/sandvik-mobile-crushing-and-scre.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/yinghuiinternational.com\/wp-content\/uploads\/2025\/06\/sandvik-mobile-crushing-and-scre.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/yinghuiinternational.com\/wp-content\/uploads\/2025\/06\/sandvik-mobile-crushing-and-scre.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":8397,"url":"https:\/\/yinghuiinternational.com\/index.php\/2023\/08\/29\/schenck-process-mining-to-become-sandvik\/","url_meta":{"origin":8908,"position":1},"title":"Schenck Process Mining to become Sandvik","author":"yinghui","date":"August 29, 2023","format":false,"excerpt":"ALEXANDRA EASTWOOD The next step in the integration of SP Mining (the mining related business of Schenck Process acquired by global, high-tech engineering group Sandvik), will see SP mining entities change their names to reflect the new ownership. On the October 1, Schenck Process Australia Pty Limited, which became a\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/08\/Screenshot-2023-08-29-at-9.31.53-am-1024x575.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/08\/Screenshot-2023-08-29-at-9.31.53-am-1024x575.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/08\/Screenshot-2023-08-29-at-9.31.53-am-1024x575.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2023\/08\/Screenshot-2023-08-29-at-9.31.53-am-1024x575.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8953,"url":"https:\/\/yinghuiinternational.com\/index.php\/2025\/04\/11\/8953\/","url_meta":{"origin":8908,"position":2},"title":"Sandvik showcases innovative rock processing\u2026","author":"yinghui","date":"April 11, 2025","format":false,"excerpt":"Sandvik showcases innovative rock processing technology at bauma 2025 by\u00a0Guy Woodford The Sandvik CH830i cone crusher with ACS-c is on show at bauma 2025. Image\/Sandvik Share on FacebookShare on Twitter Sandvik is showcasing its latest lineup of eco-efficient rock processing solutions at bauma 2025, designed to address the increasing demand\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"The Sandvik CH830i cone crusher with ACS-c is on show at bauma 2025. Image\/Sandvik","src":"https:\/\/i0.wp.com\/www.aggbusiness.com\/wp-content\/uploads\/2025\/04\/Sandvik-cone-crusher-ch830i-with-ACS-c_JPEG-750x422.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.aggbusiness.com\/wp-content\/uploads\/2025\/04\/Sandvik-cone-crusher-ch830i-with-ACS-c_JPEG-750x422.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.aggbusiness.com\/wp-content\/uploads\/2025\/04\/Sandvik-cone-crusher-ch830i-with-ACS-c_JPEG-750x422.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.aggbusiness.com\/wp-content\/uploads\/2025\/04\/Sandvik-cone-crusher-ch830i-with-ACS-c_JPEG-750x422.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":1644,"url":"https:\/\/yinghuiinternational.com\/index.php\/2016\/07\/04\/peppertree-quarry-a-generational-investment\/","url_meta":{"origin":8908,"position":3},"title":"PEPPERTREE QUARRY A \u2018GENERATIONAL INVESTMENT\u2019","author":"yinghui","date":"July 4, 2016","format":false,"excerpt":"Eight storage silos for the base materials are fed by a complex 3D maze of conveyors from multiple crushing and screening plants. PEPPERTREE QUARRY A \u2018GENERATIONAL INVESTMENT\u2019 Posted July 04, 2016 | In 2014 Boral commissioned an advanced processing plant for Peppertree Quarry, south of Sydney. This facility \u2013 featuring\u2026","rel":"","context":"In &quot;Mines and Quarry&quot;","block_context":{"text":"Mines and Quarry","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/mines-and-quarry\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8902,"url":"https:\/\/yinghuiinternational.com\/index.php\/2025\/02\/13\/crushing-and-screening-solutions-for-any-setting\/","url_meta":{"origin":8908,"position":4},"title":"Crushing and screening solutions for any setting","author":"yinghui","date":"February 13, 2025","format":false,"excerpt":"Utilising its fleet of mobile and fixed plants, Rapid has tailored its services to align with different kinds of mine outputs. Image: Rapid Crushing & Screening Contractors Rapid Crushing & Screening Contractors has a strong track record of providing tailored solutions that boost productivity. Rapid Crushing & Screening Contractors, one\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Rapid-1024x714.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Rapid-1024x714.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Rapid-1024x714.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.australianmining.com.au\/wp-content\/uploads\/2025\/02\/Rapid-1024x714.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":9028,"url":"https:\/\/yinghuiinternational.com\/index.php\/2025\/11\/10\/onetrak-helps-the-macar-group-go-for-gold\/","url_meta":{"origin":8908,"position":5},"title":"Onetrak helps the MACAR Group go for gold","author":"yinghui","date":"November 10, 2025","format":false,"excerpt":"by\u00a0William Arnott Currently the cone crusher is crushing 25mm milled rock down to -8mm. Image: Onetrak Share on FacebookShare on Twitter The MACAR Group has turned to a Striker CQ400 cone crusher from Onetrak to handle a challenging mining project.\u00a0 The MACAR Group, a Western Australian crushing and screening company\u2026","rel":"","context":"In &quot;Clients&quot;","block_context":{"text":"Clients","link":"https:\/\/yinghuiinternational.com\/index.php\/category\/clients\/"},"img":{"alt_text":"Onetrak","src":"https:\/\/i0.wp.com\/www.quarrymagazine.com\/wp-content\/uploads\/2025\/11\/Onetrak-MACAR-2-750x500.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.quarrymagazine.com\/wp-content\/uploads\/2025\/11\/Onetrak-MACAR-2-750x500.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.quarrymagazine.com\/wp-content\/uploads\/2025\/11\/Onetrak-MACAR-2-750x500.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.quarrymagazine.com\/wp-content\/uploads\/2025\/11\/Onetrak-MACAR-2-750x500.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/comments?post=8908"}],"version-history":[{"count":1,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8908\/revisions"}],"predecessor-version":[{"id":8909,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/posts\/8908\/revisions\/8909"}],"wp:attachment":[{"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/media?parent=8908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/categories?post=8908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yinghuiinternational.com\/index.php\/wp-json\/wp\/v2\/tags?post=8908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}